Laserfiche WebLink
and replacements shall be made. When the facility is again ready for operation, it <br />shall be brought on line and a new test shall be started. This procedure shall be <br />repeated as often as necessary until the facility has operated continuously to the <br />satisfaction of the Owner and Engineer, for the specified duration. <br />4. The Owner will furnish all operating personnel (other than vendor's or <br />subcontractor's service personnel) needed to operate equipment during the final <br />test period; however, said personnel will perform their duties under Contractor's <br />direct supervision. Until performance tests are completed and units and systems <br />are accepted by the Owner as substantially complete, the Contractor shall be fully <br />responsible for the operation and maintenance of all new facilities. <br />5. The Owner will provide all necessary chemicals and electricity. However, the <br />Contractor shall provide all necessary personnel of the various construction trades, <br />i.e., electricians, plumbers, etc, and field service personnel of the major system <br />suppliers on an 8 hour per day basis at the facilities. <br />6. Do not, at any time, during startup allow the facility to be operated in a manner <br />which subjects equipment to conditions that are more severe than the maximum <br />allowable operating conditions for which the equipment was designed. <br />