Laserfiche WebLink
SECTION 00100 <br />INSTRUCTIONS TO BIDDERS <br />(Based Upon EJCDC No. C-700,2002 Ed.) <br />West Regional WWTP Anaerobic Tanks Odor Control System Design <br />1.01 DEFINED TERMS <br />Terms used in these Instructions to Bidders which are defined in the Standard General <br />Conditions of the Construction Contract (No. C-700, 2002 ed.) have the meanings <br />assigned to them in the General Conditions. The term "Bidder" means one who submits a <br />bid directly to Owner, as distinct from a sub -bidder, who submits a bid to a Bidder. The <br />term "Successful Bidder" means the lowest, qualified, responsible, and responsive Bidder <br />to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an <br />award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, <br />Instructions to Bidders, The Bid Form, Disclosure of Relationships Statement, General <br />Information Regarding Bidder, and the proposed Contract Documents (including all <br />Addenda issued prior to receipt of Bids). <br />1.02 COPIES OF BIDDING DOCUMENTS <br />A. Complete sets of the Bidding Documents as stated in the Advertisement or <br />Invitation to Bid may be obtained from Demandstar. <br />B. Complete sets of Bidding Documents must be used in preparing Bids; neither <br />Owner nor Engineer assumes any responsibility for errors or misinterpretations <br />resulting from the use of incomplete sets of Bidding Documents. <br />C Owner and Engineer, in making copies of Bidding Documents available on the <br />above terms, do so only for the purpose of obtaining Bids on the work and do not <br />confer a license or grant for any other use of the Bidding Documents. <br />1.03 QUALIFICATIONS OF BIDDERS <br />To demonstrate qualifications to perform the work, each Bidder must also be prepared to <br />submit, within 5 days of Owner's request, written evidence, such as financial data, <br />previous experience, present commitments, and other such data as may be necessary to <br />prove to the satisfaction of the Owner that the Bidder is qualified by experience to do the <br />work and is prepared to complete the work within the stated time period. <br />1.04 EXAMINATION OF CONTRACT DOCUMENTS AND SITE <br />A. It is the responsibility of each Bidder, before submitting a bid, to (a) examine the <br />Contract Documents thoroughly, (b) visit the site to become familiar with local <br />conditions that may affect cost progress, performance, or furnishing of the work, <br />(c) consider federal, state, and local laws and regulations that may affect costs, <br />progress, performance, or furnishing of the work, (d) study and carefully correlate <br />00100-1 <br />