Laserfiche WebLink
® UTILITIES - MAYBE PRESENT ALONG LIMITS OF PROJECT <br />FP&L <br />AT&T <br />IRC Utilities <br />Comcast Cable Communications <br />IRC Telecommunications (Fiber) <br />Crossings of utility facilities and sleeves exist though out project. Some utility trenches may <br />have been backfilled with concrete or flowable fill. County will try to determine if any crossing <br />would affect the construction of the project. <br />• OPEN DISCUSSION <br />Driveways shall be saw cut and match. <br />Contractor should pave first lift of asphalt to protect base before shifting traffic. <br />Testing <br />Traffic <br />Test prior to injection of emulsion <br />Consistent gradation prior to inject of emulsion <br />After injection —test of in-place material for maximum density of reclaimed base. <br />Reclaimed base to have structural coefficient (2.0 desirable, 1.8 minimum accepted) <br />Contractor pays for design testing for mixing and structural coefficient <br />IRC is responsible for testing cost of compaction and density testing costs and <br />verification of Contractor testing results. <br />There are 3 intersections with traffic signals and detector loops — prior to milling up <br />intersection, Contractor must have new video detection system in place - (Econolite) <br />and a Type 1 cabinet are County standards. <br />No asbuilt drawings required. <br />Sheets 13 — 28 are for informational purposes only — do not follow construction turnouts <br />Anticipated start date is June, 2013 <br />Sue Zheng, Dunkelberger, stated water may need to be added in order to obtain optimum <br />moisture of reclaimed base prior to compacting. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ <br />0926\Adinim\Meetings\Pre-bid Meeting Minutes.doc <br />