My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-090A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-090A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 11:45:59 AM
Creation date
3/23/2016 8:37:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/13/2013
Control Number
2013-090A
Agenda Item Number
8.D.
Entity Name
Roseland Road to Easy Street
Resurfacing CR 512
Subject
CR 512 County Road 512
Project Number
1132
Bid Number
2013006
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002L6.tif
Meeting Body
No data from migration
Meeting Type
NA
SmeadsoftID
11922
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION: <br />The proposed improvements to CR -512 consist of refurbishing (full depth reclamation) of the dual <br />eastbound lanes from Roseland Road to Easy Street. Also included with the project is the <br />installation of vehicular detector assemblies and the signing and marking of the proposed <br />resurfaced eastbound lanes. <br />CORRESPONDENCEILINES OF AUTHORITY: <br />All project correspondence during the bidding process should be addressed to Jerry Davis, <br />Purchasing Manager, Indian River County, Engineering Division, 1800 27th Street, Vero Beach, <br />Florida 32960 purchasing@ircgov.com. <br />CONTACT INFORMATION <br />Jerry Davis, Purchasing Manager (772) 226-1418 <br />E-mail: purchasing@ircgov.com <br />PROJECT DISCUSSION: <br />® FULL DEPTH RECLAMATION <br />® MOT <br />One (1) eastbound through lane must remain open at all times. Access for businesses <br />must be maintained at all times. <br />Blue and white signs required for businesses??? <br />72 hour public notification for lane switches or closings <br />Traffic control plan is not required to be signed and sealed by FL licensed engineer— <br />submittals may be sent via email to Jeanne Bresett <br />Cones will be used for traffic during the day; barrels or barricades must be used in the <br />evening <br />Speed limit reduction will be reviewed after project has begun <br />Detour of side streets?????? Check with City of Sebastian <br />Working nights/weekends - ?????? <br />Approximate hourly rates for inspector: Hourly $40.00 <br />Overtime $60.00 <br />FAPublic Works\ENGINEERING DIVISION PROJECTSU 132 -CR 512 Ebnd Reswfacing Roseland Rd to Easy St -SEE PROJ <br />0926\Admim\Mcctings\Pre-bid Meeting Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.