My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/14/1991
CBCC
>
Meetings
>
1990's
>
1991
>
5/14/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:20:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/14/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FP_ <br />MAY 4 1991 <br />88th <br />Street <br />102nd Avenue <br />to <br />98th Avenue <br />.5 <br />85th <br />Street No. <br />102nd Avenue <br />to <br />106th Avenue <br />.5 <br />85th <br />Street <br />94th Avenue <br />to <br />95th Court <br />.2 <br />85th <br />Street So. <br />102nd Avenue <br />to <br />102nd Court <br />.06 <br />83rd <br />Street <br />102nd Avenue <br />to <br />106th Avenue <br />.5 <br />81st <br />Street <br />102nd Avenue <br />to <br />105th Avenue <br />.4 <br />79th <br />Street <br />90th Avenue <br />to <br />92nd Avenue <br />.25 <br />79th <br />Street <br />98th Avenue <br />to <br />102nd Avenue <br />.5 <br />12.98 miles <br />Most of the 12.98 miles of additional unmaintained <br />roads listed above are in reasonable condition and <br />extensive reconstruction is not needed. Additional <br />shell/marl stabilized material will be needed to <br />improve the roads so that adequate grading can occur. <br />It is estimated that 10,000 C.Y. of material will be <br />needed at a cost of $50,000.00. <br />The existing grader route #6 can absorb the additional <br />grading and still provide a 4 - 6 week period between <br />gradings. A map of the proposed grading route is on <br />file in the office of the Board of County <br />Commissioners. <br />Alternative No. 2 <br />In addition to the approximate 12.98 miles of <br />additional grading, all of the approximate 70 miles of <br />roads in Vero Lakes Estates could be graded. This <br />alternative would result in approximately 30 miles of <br />additional grading than Alternative No. 1. Staff does <br />not recommend such an aggressive grading policy since <br />demand is not existing. <br />RECOMMENDATIONS AND FUNDING <br />It is recommended that Alternative No. 1 be approved. <br />Funding to be from FY 90/91 and FY .91/92 Road and Bridge <br />Division Fund 111-214-. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Scurlock, the Board unanimously approved <br />Alternative No. 1 as recommended by staff. <br />CONTRACT TRAFFIC ENGINEERING SERV. - KIMLEY-HORN (U.S.I AT <br />HIGHLAND DR. SW & SR60 AT 82ND AVE.) <br />The Board reviewed memo from Traffic Engineer Dudeck: <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.