My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND B. Review of Applications <br /> COMPLETION <br /> 1. ENGINEER will, within 10 days after <br /> receipt of each Application for Payment, either <br /> 14.01 Schedule of Values indicate in writing a recommendation of <br /> payment and present the Application to <br /> A. The schedule of values established as provid- OWNER or return the Application to <br /> ed in paragraph 2.07.A will serve as the basis for CONTRACTOR indicating in writing <br /> progress payments and will be incorporated into a ENGINEER's reasons for refusing to <br /> form of Application for Payment acceptable to ENGI- recommend payment. In the latter case, CON- <br /> NEER. Progress payments on account of Unit Price TRACTOR may make the necessary <br /> Work will be based on the number of units completed. corrections and resubmit the Application. <br /> 14.02 Progress Payments 2. ENGINEER's recommendation of <br /> any payment requested in an Application for <br /> A. Applications for Payments Payment will constitute a representation by <br /> ENGINEER to OWNER, based on <br /> 1. At least 20 days before the date ENGINEER's observations on the Site of the <br /> established for each progress payment (but not executed Work as an experienced and qualified <br /> more often than once a month), design professional and on ENGINEER's <br /> CONTRACTOR shall submit to ENGINEER for review of the Application for Payment and the <br /> review an Application for Payment filled out and accompanying data and schedules, that to the <br /> signed by CONTRACTOR covering the Work best of ENGINEER's knowledge, information <br /> completed as of the date of the Application and and belief: <br /> accompanied by such supporting <br /> documentation as is required by the Contract a. the Work has progressed to the point <br /> Documents. If payment is requested on the indicated; <br /> basis of materials and equipment not <br /> incorporated in the Work but delivered and b. the quality of the Work is generally in <br /> suitably stored at the Site or at another location accordance with the Contract Documents <br /> agreed to in writing, the Application for Payment (subject to an evaluation of the Work as a <br /> shall also be accompanied by a bill of sale, functioning whole prior to or upon <br /> invoice, or other documentation warranting that Substantial Completion, to the results of any <br /> OWNER has received the materials and equip- subsequent tests called for in the Contract <br /> ment free and clear of all Liens and evidence Documents, to a final determination of <br /> that the materials and equipment are covered quantities and classifications for Unit Price <br /> by appropriate property insurance or other Work under paragraph 9.08, and to any <br /> arrangements to protect OWNER's interest other qualifications stated in the <br /> therein, all of which must be satisfactory to recommendation); and <br /> OWNER. <br /> c. The conditions precedent to <br /> 2. Beginning with the second CONTRACTOR's being entitled to such <br /> Application for Payment, each Application shall payment appear to have been fulfilled in so <br /> include an affidavit of CONTRACTOR stating far as it is ENGINEER's responsibility to <br /> that all previous progress payments received observe the Work. <br /> on account of the Work have been applied on <br /> account to discharge CONTRACTOR's 3. By recommending any such <br /> legitimate obligations associated with prior payment ENGINEER will not thereby be <br /> Applications for Payment. deemed to have represented that: (i) inspec- <br /> tions made to check the quality or the quantity <br /> 3. The amount of retainage with respect of the Work as it has been performed have <br /> to progress payments will be as stipulated in been exhaustive, extended to every aspect of <br /> the Agreement. the Work in progress, or involved detailed <br /> inspections of the Work beyond the responsi- <br /> bilities specifically assigned to ENGINEER in <br /> the Contract Documents, or (ii) that there may <br /> not be other matters or issues between the <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-39 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)V\dmim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.