My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parties that might entitle CONTRACTOR to be 1. Ten days #erpreSeft atien of-the <br /> paid additionally by OWNER or entitle OWNER Application for PaymeRt tG OWNER with <br /> to withhold payment to CONTRACTOR. ENGINEER's recommendation, the—amoun} <br /> 4. Neither ENGINEER's review of paragraph 14.02.D) beGGme due, and when <br /> CONTRACTOR's Work for the purposes of due will be paid by OWNER to C-ONTR4GTOR <br /> recommending payments nor ENGINEER's <br /> recommendation of any payment, including final D. Reduction in Payment <br /> payment, will impose responsibility on <br /> ENGINEER to supervise, direct, or control the 1. OWNER may refuse to make <br /> Work or for the means, methods, techniques, payment of the full amount recommended by <br /> sequences, or procedures of construction, or ENGINEER because: <br /> the safety precautions and programs incident <br /> thereto, or for CONTRACTOR's failure to a. claims have been made against <br /> comply with Laws and Regulations applicable to OWNER on account of CONTRACTOR's <br /> CONTRACTOR's performance of the Work. performance or furnishing of the Work; <br /> Additionally, said review or recommendation will <br /> not impose responsibility on ENGINEER to b. Liens have been filed in connection <br /> make any examination to ascertain how or for with the Work, except where <br /> what purposes CONTRACTOR has used the CONTRACTOR has delivered a specific <br /> moneys paid on account of the Contract Price, Bond satisfactory to OWNER to secure the <br /> or to determine that title to any of the Work, satisfaction and discharge of such Liens; <br /> materials, or equipment has passed to <br /> OWNER free and clear of any Liens. c. there are other items entitling OWN- <br /> ER to a set-off against the amount <br /> 5. ENGINEER may refuse to recom- recommended; or <br /> mend the whole or any part of any payment if, <br /> in ENGINEER's opinion, it would be incorrect to d. OWNER has actual knowledge of the <br /> make the representations to OWNER referred occurrence of any of the events enumerated <br /> to in paragraph 14.02.8.2. ENGINEER may in paragraphs 14.02.B.5.a through <br /> also refuse to recommend any such payment 14.02.B.5.c or paragraph 15.02.A. <br /> or, because of subsequently discovered <br /> evidence or the results of subsequent 2. If OWNER refuses to make payment <br /> inspections or tests, revise or revoke any such of the full amount recommended by <br /> payment recommendation previously made, to ENGINEER, OWNER must give <br /> such extent as may be necessary in CONTRACTOR immediate written notice (with <br /> ENGINEER's opinion to protect OWNER from a copy to ENGINEER) stating the reasons for <br /> loss because: such action and promptly pay CONTRACTOR <br /> any amount remaining after deduction of the <br /> a. the Work is defective, or completed amount so withheld. OWNER shall promptly <br /> Work has been damaged, requiring pay CONTRACTOR the amount so withheld, or <br /> correction or replacement; any adjustment thereto agreed to by OWNER <br /> and CONTRACTOR, when CONTRACTOR <br /> b. the Contract Price has been reduced corrects to OWNER's satisfaction the reasons <br /> by Written Amendment or Change Orders; for such action. <br /> c. OWNER has been required to correct 3. If it is subsequently determined that <br /> defective Work or complete Work in accor- OWNER's refusal of payment was not justified, <br /> dance with paragraph 13.09; or the amount wrongfully withheld shall be treated <br /> as an amount due as determined by paragraph <br /> A CNIGINICGt? has aGtUal knowledge of 14.02.C.1. <br /> the OGGUrrenGe Gf aRY of the events enumer- <br /> . 14.03 CONTRACTOR's Warranty of Title <br /> C. Payment Becomes Due A. CONTRACTOR warrants and guarantees <br /> that title to all Work, materials, and equipment covered <br /> by any Application for Payment, whether incorporated <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-40 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.