My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the Project or not, will pass to OWNER no later than B. OWNER shall have the right to exclude <br /> the time of payment free and clear of all Liens. CONTRACTOR from the Site after the date of <br /> Substantial Completion, but OWNER shall allow CON- <br /> 14.04 Substantial Completion TRACTOR reasonable access to complete or correct <br /> items on the tentative list. <br /> A. When CONTRACTOR considers the entire <br /> Work ready for its intended use CONTRACTOR shall 14.05 Partial Utilization <br /> notify OWNER and ENGINEER in writing that the <br /> entire Work is substantially complete (except for items A. Use by OWNER at OWNER's option of any <br /> specifically listed by CONTRACTOR as incomplete) substantially completed part of the Work which has <br /> and request that ENGINEER issue a certificate of specifically been identified in the Contract Documents, <br /> Substantial Completion. Promptly thereafter, or which OWNER, ENGINEER, and CONTRACTOR <br /> OWNER, CONTRACTOR, and ENGINEER shall agree constitutes a separately functioning and usable <br /> make an inspection of the Work to determine the part of the Work that can be used by OWNER for its <br /> status of completion. If ENGINEER does not consider intended purpose without significant interference with <br /> the Work substantially complete, ENGINEER will CONTRACTOR's performance of the remainder of <br /> notify CONTRACTOR in writing giving the reasons the Work, may be accomplished prior to Substantial <br /> therefore. If ENGINEER Gonsiders the Work Completion of all the Work subject to the following <br /> substantially Gemplete, ENG_InIF_Ga ,.,ill Prepare conditions. <br /> deliver to OWNER a tentative r--e—r1ifircate of <br /> Completion whiGh shall fix the date of Substantial 1. OWNER at any time may request <br /> Completion. There shall be @tt@Ghed te the GeFtifiGate CONTRACTOR in writing to permit OWNER to <br /> use any such part of the Work which OWNER <br /> before finalpa7ment. OVVNIFR shall ha=e seven daT-, believes to be ready for its intended use and <br /> after receipt Gf the tentative rGeirtifir—ate during whiGh to substantially complete. If CONTRACTOR <br /> make written ohiertinn to ENIG;INIEERas to any agrees that such part of the Work is <br /> substantially complete, CONTRACTOR will <br /> certify to OWNER and ENGINEER that such <br /> that the Work is net—substantially complete-, part of the Work is substantially complete and <br /> ENGINEER will within 14 day after ubmi inn of the request ENGINEER to issue a certificate of <br /> tentative GeFtifiGate to OWNER Retify CONTRACTOR Substantial Completion for that part of the <br /> in .�;ritinQ, stating t�h�reasens therefor. If after Work. CONTRACTOR at any time may notify <br /> Guns deration _.�W R's ebjeGtier�s, €�'b:":E€R OWNER and ENGINEER in writing that <br /> Gens substantially GOMplete, CONTRACTOR considers any such part of the <br /> €NEIN€€R—wiu witWn said 14 days exec to and Work ready for its intended use and substan- <br /> tially complete and request ENGINEER to issue <br /> GeFtifiGate of Substantial Completic)n (with a revised a certificate of Substantial Completion for that <br /> tentative Iist of items to be GOMpleted GF GeFrerted) part of the Work. Within a reasonable time <br /> reflertinn c irh change from the tentative rertifiGate after either such request, OWNER, <br /> as ENGINEER believes justified after Gensideration of CONTRACTOR, and ENGINEER shall make <br /> an inspection of that part of the Work to <br /> determine its status of completion. if <br /> ENGINEER will deliver to OWNER and C-C-:)NITRAC- ENGINEER does not consider that part of the <br /> Work to be substantially complete, ENGINEER <br /> responsibilities pending final payment between will notify OWNER and CONTRACTOR in <br /> writing giving the reasons therefor. If <br /> Work, ENGINEER considers that part of the Work to <br /> na RGe,-hen , utilities, innsuranGe and warra Rtie be substantially complete, the provisions of <br /> and guarantees. Unless OWNER and paragraph 14.04 will apply with respect to <br /> CONTRACTOR agree etheAAIRA A V;Pting and GG certification of Substantial Completion of that <br /> inform ENI(_IN EER in writing prier to ENGINEER's part of the Work and the division of <br /> responsibility in respect thereof and access <br /> tion ENGINEER's aforesaid rerommend-ation grill he thereto. <br /> binding on 01AINIFIR ;;Pd lQQNITR4l2TQR unto! final <br /> payment. 2. No occupancy or separate operation <br /> of part of the Work may occur prior to <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-41 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Hdmlm\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.