My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with the requirements of paragraph furnish such a release or receipt in full, CON- <br /> 5.10 regarding property insurance. TRACTOR may furnish a Bond or other <br /> collateral satisfactory to OWNER to indemnify <br /> 14.06 Final Inspection OWNER against any Lien. <br /> A. Upon written notice from CONTRACTOR that B. Review of Application and Acceptance <br /> the entire Work or an agreed portion thereof is <br /> complete, ENGINEER will promptly make a final 1. If, on the basis of ENGINEER's <br /> inspection with OWNER and CONTRACTOR and will observation of the Work during construction <br /> notify CONTRACTOR in writing of all particulars in and final inspection, and ENGINEER's review <br /> which this inspection reveals that the Work is of the final Application for Payment and <br /> incomplete or defective. CONTRACTOR shall accompanying documentation as required by <br /> immediately take such measures as are necessary to the Contract Documents, ENGINEER is <br /> complete such Work or remedy such deficiencies. satisfied that the Work has been completed <br /> and CONTRACTOR's other obligations under <br /> 14.07 Final Payment the Contract Documents have been fulfilled, <br /> ENGINEER will, within ten days after receipt of <br /> A. Application for Payment the final Application for Payment, indicate in <br /> writing ENGINEER's recommendation of <br /> 1. After CONTRACTOR has, in the payment and present the Application for <br /> opinion of ENGINEER, satisfactorily completed Payment to OWNER for payment. At the same <br /> all corrections identified during the final time ENGINEER will also give written notice to <br /> inspection and has delivered, in accordance OWNER and CONTRACTOR that the Work is <br /> with the Contract Documents, all maintenance acceptable subject to the provisions of <br /> and operating instructions, schedules, guaran- paragraph 14.09. Otherwise, ENGINEER will <br /> tees, Bonds, certificates or other evidence of return the Application for Payment to <br /> insurance certificates of inspection, marked-up CONTRACTOR, indicating in writing the <br /> record documents (as provided in paragraph reasons for refusing to recommend final <br /> 6.12), and other documents, CONTRACTOR payment, in which case CONTRACTOR shall <br /> may make application for final payment follow- make the necessary corrections and resubmit <br /> ing the procedure for progress payments. the Application for Payment. <br /> 2. The final Application for Payment C. Payment Becomes Due <br /> shall be accompanied (except as previously <br /> delivered) by: (i) all documentation called for in 1. Thirty days after the pFesentat,ori to <br /> the Contract Documents, including but not OWNER of the AppliGation for Payment and <br /> limited to the evidence of insurance required byg dGGUmentatiGrl, the ameun <br /> subparagraph 5.04.B.7; (ii) consent of the ENGINEFR ;'A''011 di <br /> surety, if any, to final payment; and (iii) arae,when due, be paidbyn� NER to <br /> complete and legally effective releases or CONTRACT <br /> waivers (satisfactory to OWNER) of all Lien <br /> rights arising out of or Liens filed in connection 14.08 Final Completion Delayed <br /> with the Work. <br /> A. If, through no fault of CONTRACTOR, final <br /> 3. In lieu of the releases or waivers of completion of the Work is significantly delayed, and if <br /> Liens specified in paragraph 14.07.A.2 and as ENGINEER so confirms, OWNER shall, upon receipt <br /> approved by OWNER, CONTRACTOR may of CONTRACTOR's final Application for Payment and <br /> furnish receipts or releases in full and an recommendation of ENGINEER, and without terminat- <br /> affidavit of CONTRACTOR that: (i)the releases ing the Agreement, make payment of the balance due <br /> and receipts include all labor, services, for that portion of the Work fully completed and <br /> material, and equipment for which a Lien could accepted. If the remaining balance to be held by <br /> be filed; and (ii) all payrolls, material and OWNER for Work not fully completed or corrected is <br /> equipment bills, and other indebtedness less than the retainage stipulated in the Agreement, <br /> connected with the Work for which OWNER or and if Bonds have been furnished as required in <br /> OWNER's property might in any way be paragraph 5.01, the written consent of the surety to <br /> responsible have been paid or otherwise satis- the payment of the balance due for that portion of the <br /> fied. If any Subcontractor or Supplier fails to Work fully completed and accepted shall be submitted <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-42 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.