My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by CONTRACTOR to ENGINEER with the Application under paragraph 2.07 as adjusted from time to <br /> for such payment. Such payment shall be made time pursuant to paragraph 6.04),- <br /> under <br /> .04);under the terms and conditions governing final <br /> payment, except that it shall not constitute a waiver of 2. CONTRACTOR's disregard of Laws <br /> Claims. or Regulations of any public body having <br /> jurisdiction; <br /> 14.09 Waiver of Claims <br /> 3. CONTRACTOR's disregard of the <br /> A. The making and acceptance of final payment authority of ENGINEER; or <br /> will constitute: <br /> 4. CONTRACTOR's violation in any <br /> 1. a waiver of all Claims by OWNER substantial way of any provisions of the <br /> against CONTRACTOR, except Claims arising Contract Documents. <br /> from unsettled Liens, from defective Work <br /> appearing after final inspection pursuant to B. If one or more of the events identified in <br /> paragraph 14.06, from failure to comply with the paragraph 15.02.A occur, OWNER may, after giving <br /> Contract Documents or the terms of any special CONTRACTOR (and the surety, if any) seven days <br /> guarantees specified therein, or from written notice, terminate the services of <br /> CONTRACTOR's continuing obligations under CONTRACTOR, exclude CONTRACTOR from the <br /> the Contract Documents; and Site, and take possession of the Work and of all <br /> CONTRACTOR's tools, appliances, construction <br /> 2. a waiver of all Claims by CONTRAC- equipment, and machinery at the Site, and use the <br /> TOR against OWNER other than those same to the full extent they could be used by <br /> previously made in writing which are still CONTRACTOR (without liability to CONTRACTOR for <br /> unsettled. trespass or conversion), incorporate in the Work all <br /> materials and equipment stored at the Site or for <br /> which OWNER has paid CONTRACTOR but which <br /> ARTICLE 15 - SUSPENSION OF WORK AND are stored elsewhere, and finish the Work as OWNER <br /> TERMINATION may deem expedient. In such case, CONTRACTOR <br /> shall not be entitled to receive any further payment <br /> until the Work is finished. If the unpaid balance of the <br /> 15.01 OWNER May Suspend Work Contract Price exceeds all claims, costs, losses, and <br /> damages (including but not limited to all fees and <br /> A. At any time and without cause, OWNER may charges of engineers, architects, attorneys, and other <br /> suspend the Work or any portion thereof for a period professionals and all court or arbitration or other <br /> of not more than 90 consecutive days by notice in dispute resolution costs) sustained by OWNER arising <br /> writing to CONTRACTOR and ENGINEER which will out of or relating to completing the Work, such excess <br /> fix the date on which Work will be resumed. CON- will be paid to CONTRACTOR. If such claims, costs, <br /> TRACTOR shall resume the Work on the date so losses, and damages exceed such unpaid balance, <br /> fixed. CONTRACTOR shall be allowed an adjustmen CONTRACTOR shall pay the difference to OWNER. <br /> Such claims, costs, losses, and damages incurred by <br /> Tomes, or both, d'FeGtly attributable to any SUGh OWNER will be reviewed by ENGINEER as to their <br /> reasonableness and, when so approved by <br /> as provided On paraqFaph 10-G& ENGINEER, incorporated in a Change Order. When <br /> exercising any rights or remedies under this <br /> 15.02 OWNER May Terminate for Cause paragraph OWNER shall not be required to obtain the <br /> lowest price for the Work performed. <br /> A. The occurrence of any one or more of the <br /> following events will justify termination for cause: C. Where CONTRACTOR's services have been <br /> so terminated by OWNER, the termination will not <br /> 1. CONTRACTOR's persistent failure affect any rights or remedies of OWNER against <br /> to perform the Work in accordance with the CONTRACTOR then existing or which may thereafter <br /> Contract Documents (including, but not limited accrue. Any retention or payment of moneys due <br /> to, failure to supply sufficient skilled workers or CONTRACTOR by OWNER will not release CON- <br /> suitable materials or equipment or failure to TRACTOR from liability. <br /> adhere to the progress schedule established <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-43 <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.