My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-13.03 Test and Inspections <br /> SC-13.03.13. Delete the first sentence of paragraph GC-13.03.B in its entirety, and insert the <br /> following sentences in its place.- <br /> B. <br /> lace:B. OWNER shall employ and pay for the services of an independent testing <br /> laboratory to perform all initial inspections, tests, or approvals required by the <br /> Contract Documents except those inspections, tests, or approvals listed <br /> immediately below. Subsequent inspections, tests, or approvals required after <br /> initial failing inspections, tests, or approvals shall be paid for by the <br /> CONTRACTOR by back charge to subsequent applications for payment. The <br /> CONTRACTOR shall arrange, obtain, and pay for the following inspections, <br /> tests, or approvals: <br /> 1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br /> below; <br /> 2. costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13.04.13 shall be paid as provided in said paragraph 13.04.13; <br /> 3. tests otherwise specifically provided in the Contract Documents. <br /> 13.05 OWNER May Stop the Work <br /> I SC-13.05.A. Delete paragraph GC-13.05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or <br /> suitable materials or equipment, or fails to comply with permit requirements, or fails <br /> to comply with the technical specifications, or fails to perform the Work in such a way <br /> that the completed Work will conform to the Contract Documents, OWNER may order <br /> CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order <br /> has been eliminated; however, this right of OWNER to stop the Work shall not give rise <br /> to any duty on the part of OWNER to exercise this right for the benefit of <br /> CONTRACTOR, any Subcontractor, any Supplier, any other individual or entity, or any <br /> surety for, or employee or agent of any of them. <br /> SC-13.07 Correction Period <br /> SC-13.07 A. Delete the first sentence of paragraph GC-13.07.A in its entirety and insert the <br /> following sentence in its place <br /> A. If within one year after the date of Final Completion or such longer period of time <br /> as may be prescribed by Laws or Regulations or by the terms of any applicable <br /> special guarantee required by the Contract Documents or by any specific provision <br /> of the Contract Documents, any Work is found to be defective, or if the repair of <br /> any damages to the land or areas made available for CONTRACTOR's use by <br /> OWNER or permitted by Laws and Regulations as contemplated in paragraph <br /> 6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to <br /> OWNER and in accordance with OWNER's written instructions: (i) repair such <br /> defective land or areas, or (ii) correct such defective Work or, if the defective Work <br /> has been rejected by OWNER, remove it from the Project and replace it with Work <br /> that is not defective, and (iii) satisfactorily correct or repair or remove and replace <br /> any damage to other Work, to the work of others or other land or areas resulting <br /> therefrom. <br /> 00800-7 <br /> 00800-Supplementary Conditions LAP rev.doc <br /> 00800 7F\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\LAP Documents\00800- <br /> Supplementary Conditions LAP rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.