My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025.1
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:13:50 PM
Creation date
3/23/2016 9:11:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025.1
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Sidewalk Improvements
Area
Old Dixie Highway Sidewalk Improvements 38th to 45th Street
Project Number
0845B
Bid Number
2014043
Alternate Name
Federal Aid Project - FM No. 423186-2-58-01
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005E9.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-13.07 B. Delete paragraph GC-13.07.8 in its entirety and insert the following sentence in its <br /> place <br /> B. In special circumstances where a particular item of equipment is placed in continu- <br /> ous service before Final Completion of all the Work, the correction period for that <br /> item may start to run from an earlier date if so provided in the Specifications or by <br /> Written Amendment. <br /> 14.02 Progress Payments <br /> SC-14.02.6.5. Delete paragraph GC-14.02.B.5.d in its entirety and insert the following paragraph <br /> in its place: <br /> d. ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15.02.A; or <br /> SC-14.02.6.5. Add the following sentences at the end of paragraph GC-14.02.8.5: <br /> e. OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections, tests, or approvals taken after initial failing <br /> inspections, tests, or approvals. <br /> SC-14.02.C.1. Delete paragraph GC-14.02.C.1 in its entirety and insert the following <br /> paragraph in its place: <br /> C. Payment Becomes Due <br /> 1. Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act. F.S. 218.70 et. seq. <br /> SC-14.04 Substantial Completion <br /> SC-14.04A. After the third sentence in paragraph GC-14.04A of the General Conditions, <br /> delete the remainder of paragraph 14.04A in its entirety and replace with the following: <br /> i "If Engineer considers the Work substantially complete, Engineer will prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> the date of Substantial Completion. In accordance with the provisions of Florida <br /> Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer, the Owner, the Engineer, and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete, <br /> satisfactory, and acceptable under this Agreement (herein the "Statutory List'). <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion. The Owner and Contractor <br /> acknowledge and agree that: 1) the failure to include any corrective work, or <br /> pending items that are not yet completed, on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement; <br /> 2) upon completion of all items on the Statutory List, the Contractor may submit a <br /> 00800-8 <br /> 00800-Supplementary Conditions LAP rev.doc <br /> 00800 8F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\LAP Documents\00800- <br /> Supplementary Conditions LAP rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.