Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
01340 — Submittal of Shop Drawings <br /> E. All submittals shall bear the stamp of approval and signature of <br /> CONTRACTOR as evidence that they have been reviewed by <br /> CONTRACTOR. Submittals without this stamp of approval will not be <br /> reviewed by the ENGINEER and will be returned to CONTRACTOR. <br /> F. Assign a number to each submittal starting with No. 1 and thence <br /> numbered consecutively. Identify resubmittals by the original submittal <br /> number followed by the suffix "A" for the first resubmittal, the suffix "B" for <br /> the second resubmittal, etc. <br /> G. Initially submit to ENGINEER a minimum of six (6) copies of all submittals <br /> that are on 11-inch by 17-inch or smaller sheets (no less than 8 1/2-inch x <br /> 11-inch), and one unfolded sepia and 2 prints made from that sepia for all <br /> submittals on sheets larger than 11-inch by 17-inch. <br /> H. After ENGINEER completes his review, Shop Drawings will be marked <br /> with one of the following notations: <br /> 1. Approved <br /> 2. Approved as Corrected <br /> 3. Approved as Corrected - Resubmit <br /> 4. Revise and Resubmit <br /> 5. Not Approved <br /> I. If a submittal is acceptable, it will be marked "Approved" or "Approved as <br /> Corrected". Three (3) prints or copies of the submittal will be returned to <br /> CONTRACTOR. <br /> J. Upon return of a submittal marked "Approved" or "Approved as <br /> Corrected", CONTRACTOR may order, ship or fabricate the materials <br /> included on the submittal, provided it is in accordance with the corrections <br /> indicated. <br /> K. If a Shop Drawing marked "Approved as Corrected" has extensive <br /> corrections or corrections affecting other drawings or Work, ENGINEER <br /> may require that CONTRACTOR make the corrections indicated thereon <br /> and resubmit the Shop Drawings for record purposes. Such drawings will <br /> have the notation, "Approved as Corrected - Resubmit." <br /> L. If a submittal is unacceptable, three (3) copies will be returned to <br /> CONTRACTOR with one of the following notations- <br /> 1. <br /> otations:1. "Revise and Resubmit" <br /> 2. "Not Approved" <br /> 01340-Submittal of Shop Drawings.doc <br /> 01340-5 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)VAdmim\bid documents\Master Contract <br /> Documents\01340-Submittal of Shop Drawings.doc <br />