My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 — Submittal of Shop Drawings <br /> M. Upon return of a submittal marked "Revise and Resubmit", make the <br /> corrections indicated and repeat the initial approval procedure. The "Not <br /> Approved" notation is used to indicate material or equipment that is not <br /> acceptable. Upon return of a submittal so marked, repeat the initial <br /> approval procedure utilizing acceptable material or equipment. <br /> N. Any related Work performed or equipment installed without an "Approved" <br /> or "Approved as Corrected" Shop Drawing will be at the sole responsibility <br /> of the CONTRACTOR. <br /> O. Submit Shop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved. CONTRACTOR shall assume the risk for all materials or <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings. Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner. <br /> P. ENGINEER will review and process all submittals promptly, but a <br /> reasonable time should be allowed for this, for the Shop Drawings being <br /> revised and resubmitted, and for time required to return the approved <br /> Shop Drawings to CONTRACTOR. <br /> Q. Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals. All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings, Samples or other items requiring approval, will be back-charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions. If the CONTRACTOR requests a substitution <br /> for a previously approved item, all of ENGINEER'S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR. <br /> + + END OF SECTION + + <br /> 01340-Submittal of Shop Drawings.doc <br /> 01340-6 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract <br /> Documents\01340-Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.