My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
personnel. <br /> (3) Provide a safety program for the project and conduct a safety meeting prior to <br /> commencing work. <br /> f) Any disputes which may arise in this connection between the Contractor and any <br /> subcontractor must be settled between the parties concerned. The Ownerwill not undertake nor be in <br /> any way responsible for the settlement of such disputes. <br /> GC 4 ENGINEER'S STATUS. <br /> a) The Engineer will provide observation of the Contractor's activities and progress of the work. <br /> The Engineer will make complete and thorough inspections of all construction,draft change orders,and verify <br /> and certify partial and/or final payments due to the Contractor. The Engineer may, during the life of the <br /> Contract issue additional instructions, by means of drawings, minor change orders or otherwise, necessary to <br /> illustrate changes in the work. <br /> b) The Engineer shall have authority to stop the work whenever such stoppage may be <br /> necessary to insure the proper execution of the Contract or to protect the public and/or property. He shall also <br /> have authority to reject all work and materials which do not conform to the Contract and to decide questions <br /> which arise in the execution of the work. <br /> C) The Engineer will make decisions in writing on all claims of the Contractor, and on all other <br /> matters relating to the execution and progress of the work or the interpretation of the Contract documents. All <br /> such decisions of the Engineer shall be final. <br /> GC 5 DESIGN, DRAWINGS AND SPECIFICATIONS. <br /> a) The Owner through the Engineer,or the Engineer as the Owner's representative, shall furnish <br /> plans and specifications which completely represent the requirements of the work as far as practical to be <br /> performed under the Documents and shall be true developments thereof. The Owner will be responsible for <br /> the adequacy and sufficiency of the plans and specifications. The Owner or Engineer will provide the <br /> Contractor with copies of all drawings and specifications, not to exceed four (4) complete sets, for the <br /> execution of the work. <br /> b) The specifications and the drawings accompanying them are intended to describe and provide <br /> for a finished piece of work; they are intended to be complementary and what is called for by either shall be as <br /> binding as if called for by both. The Contractor understands that the work shall be complete in every detail, <br /> notwithstanding every item necessarily involved is not particularly mentioned,and the Contractor shall be held <br /> to provide all labor and material necessary for the completion of the indicated work. <br /> C) The Contractor shall, immediately upon receipt of the drawings,check all drawings furnished <br /> and shall promptly notify Owner of any illegibility, errors, omission, defect or discrepancies discovered in such <br /> drawings and shall comment as appropriate upon construction feasibility and practicality. The Contractor shall <br /> perform work only in accordance with the permitted drawings and any subsequent revisions thereto. <br /> d) If the permitted drawings change the scope of the work, the Contractor shall notify the owner <br /> and Engineer within seven (7)days of receipt of the permitted drawings and such notification shall contain a <br /> written description of the change and its impact on the cost and schedule, if any. Failure to provide such <br /> notice within seven days shall be a complete waiver by the Contractor of all additional cost and time and <br /> Contractor shall perform the work at his expense and complete the work according to schedule and in no <br /> event shall Contractor recover delay or consequential damages. <br /> e) The Contractor shall keep at the work site one (1) copy of all permitted drawings and <br /> specifications kept current with all changes and modifications and shall at all times give the Owner, the <br /> Engineer and all trades performing at the project, access thereto. <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.