My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineer. Failure of the Contractor to develop, update, revise, or submit the construction schedule(s) as <br /> aforesaid shall be sufficient grounds for the Owner to find the Contractor in material default and shall be <br /> sufficient cause to terminate the Contract or to withhold payment to the Contractor until a schedule or <br /> schedule update is submitted. <br /> C) The Contractor agrees that whenever it becomes apparent from the progress review meeting <br /> or CPM schedule that the contract completion date will not be met, the Contractor shall notify the Owner and <br /> Engineer of the potential schedule change within three(3)days of a commencement of delay or knowledge of <br /> a potential delay. Prior to requesting a time extension, Contractor shall execute some or all of the following <br /> remedial actions at Contractor's sole cost and expense: <br /> 1. Increase manpower as necessary to eliminate work backlog. <br /> 2. Increase the number of working hours per shift, shifts per working day, working days per <br /> week, construction equipment, or any combination of the foregoing to eliminate the <br /> backlog. <br /> 3. Reschedule the work in conformance with specification requirements. <br /> d) Neither the Owner nor the Contractor shall be considered to own the schedule float time. <br /> GC 12 LIQUIDATED DAMAGES. <br /> If the actual completion date for substantial completion or final completion occurs later than the time <br /> indicated in the Special Terms or later than the scheduled completion date if a duly authorized change order <br /> for time is issued, liquidated damages in the amount(s) set forth in the Special Terms shall be paid by <br /> Contractor for unexcused delay in performance of the work.. Contractor agrees that Owner's actual damages <br /> in the event of unexcused delay are difficult to ascertain and therefore the parties agree that the sums <br /> established in the Special Terms are reasonably related to what damages Owner may suffer and are <br /> enforceable liquidated damages and not penalties. <br /> GC 12 SCHEDULE OF VALUES. <br /> Within ten (10)days after the date of the Owner's issuance of a Notice to Proceed, Contractor shall <br /> submit for review and approval of Owner and Engineer, a schedule of values, by phases of work, to show a <br /> breakdown of the Contract Price corresponding to the payment request breakdown and progress schedule line <br /> items. The schedule of values must also show dollar value for each unit of work scheduled. Change Orders <br /> are to be added as separate line items. <br /> GC 13 LAND FOR WORK. <br /> Contractor's access to the site and storage areas shall be as shown on the plans and as designated by the <br /> Owner. Access routes may also be used by County employees and other contractors. No other access points <br /> shall be allowed unless approved by the Owner. All contractor traffic authorized to enter the site shall be <br /> experienced in the route or guided by contractor personnel. The Contractor is responsible for immediate <br /> cleanup of any debris deposited along the access route as a result of its construction traffic. In the event the <br /> Owner provides conditions or reasonable restrictions on the use or access to the lands upon which or adjacent <br /> to the Work under this Contract is to be done, Contractor shall comply with all such conditions or restrictions. <br /> Any delay in the furnishing of these lands by the Owner shall be deemed proper cause for an equitable <br /> adjustment in both Contract price and time of completion. <br /> Owner, and its duly authorized employees and representatives, and representatives of all <br /> governmental agencies having jurisdiction over work areas or any part thereof, shall, at all reasonable times, <br /> have access to such areas and the premises used by Contractor. Contractor shall also arrange for Owner, its <br /> representatives and employees, to have access at all reasonable times to all places where equipment or <br /> materials are being manufactured, produced or fabricated for use under the Contract. <br /> GC 14 SURVEY, LINES AND GRADE <br /> Unless otherwise specified, the Engineer shall furnish all land survey control points, base lines and <br /> benchmarks for the location of the work. The Contractor shall be responsible for the preservation of all lines, <br /> points, and elevations furnished and shall bear the expense of resetting same if Contractor or any of its <br /> subcontractors move or destroy or render inaccurate any such base lines, points and elevations. From the <br /> information provided by the Engineer, the Contractor shall develop and make all detail surveys and establish <br /> 32 <br />