My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lines and grades as required. The Contractor shall keep the Engineer informed as to his needs for base lines <br /> or bench marks in order that the same may be furnished and all necessary measurements made for the <br /> record with a minimum of inconvenience to the Engineer or delay to the Contractor. <br /> GC 15 SITE CONDITIONS. <br /> Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of <br /> the work and the general and local conditions, and particularly, but without limitation, with respect to the <br /> following: conditions affecting the transportation, access, disposal, handling and storage of materials; the <br /> availability, quantity and quality of labor, water and electric power; availability and condition of roads; climatic <br /> conditions; location of underground utilities; existing site conditions, topography and ground conditions; <br /> subsurface geology, and nature and quantity of surface and subsurface materials to be encountered; and all <br /> other matters which can in any way affect eh performance of the Contract or the cost associated therewith. <br /> Contractor's failure to assess the site conditions will not relieve it from the responsibility for properly estimating <br /> the costs and schedule of performing the work. <br /> GC 16 SUBSOIL CONDITIONS. <br /> Unless otherwise stipulated in the plans and specification, no subsoil investigations have been made. <br /> The Contractor shall satisfy itself as to all subsoil conditions. <br /> GC 17 SURFACE AND SUBSURFACE WATER <br /> The control of surface and subsurface water by Contractor shall be permitted by the proper regulatory <br /> agencies, with copies submitted to Owner. Contractor shall immediately remedy any permit violations and <br /> shall be responsible for any fines or penalties assessed by such agencies for permit violations. <br /> CG 18 CONTRACTOR WORK AREA <br /> Contractor's work area on the job site will be assigned by Owner. Contractor shall confine its office, <br /> storage, assembly, equipment and parking to the areas so assigned. Should Contractor find it necessary to <br /> use any additional land outside the work site for any purpose, Contractor shall, at its expense, provide for the <br /> use of any such additional land. <br /> CG 19 CONTRACTOR-FURNISHED MATERIALS EQUIPMENT AND WORKMANSHIP <br /> Contractor shall provide and use on any work only such construction plant and equipment as are <br /> capable of producing the quality and quantity of work and materials required by the drawings and <br /> specifications within the established schedule. Only new, unused materials and items of recent manufacture, <br /> of designated quality, free from defects, will be accepted. Contractor shall, if requested, furnish evidence <br /> satisfactory to the Owner as to the kind and quality of materials. Contractor shall utilize lumber, timber and <br /> other forest products produced and manufactured in Florida when such products are available and their price, <br /> fitness and quality are equal to comparable products. Upon written order of the Owner, Contractor shall <br /> discontinue operation of unsatisfactory plant, equipment and/or facilities. Owner will be the final authority for <br /> determining conformance of workmanship, materials, equipment and systems with the requirements of the <br /> Contract. (255.20) <br /> Where Contractor supplied drawings are required for planning or performance of the work, such <br /> drawings shall include, but not be limited to, matchmarks, erection diagrams and other details such as field <br /> connections for property installation. Such drawings shall be submitted by and at the expense of Contractor. <br /> At least 21 days shall be allowed for review by Owner. If drawings show variations from the contract <br /> requirements, the Contractor shall describe such variations in writing at the time of submission. Review and <br /> permission to proceed by Owner does not constitute acceptance or approval of design details, calculations, <br /> analyses, test methods or materials develop or selected by the Contractor and does not relieve Contractor <br /> from full compliance with contractual obligations. <br /> Where samples are required, samples shall be submitted by and at the expense of Contractor. <br /> Materials represented by such samples shall not be manufactured, delivered to the site or incorporated into <br /> the work without such review. At least 21 days shall be allowed for Owner's review. <br /> The Owner or Engineer shall notify the Contractor of defective or unacceptable work if the Owner <br /> discovers such. No work defect in construction or quality, or deficient in meeting any requirement of the <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.