Laserfiche WebLink
Contract, drawings or specifications, will be acceptable regardless of Owner's failure to discover such defects <br /> during construction; nor will inspection by the Engineer relieve Contractor from ensuing the quality of the work <br /> as required by the Contract. No payment, whether partial or final, shall be construed as an acceptance of <br /> defective work or improper materials. <br /> GC 20 PROTECTION OF THE WORK AND PROPERTY <br /> The Contractor shall continuously maintain adequate protection of all work from loss, theft or damage <br /> from whatever cause, and shall take all reasonable precautions to protect the property of the Owner and third <br /> parties from theft, injury or loss arising in connection with this Contract. Contractor shall comply with the <br /> requirements of the Owner and its insurance carriers and all applicable laws, codes and regulations with <br /> respect to prevention of damage. <br /> Contractor shall preserve and protect all cultivated and planted areas and vegetation such as trees, <br /> plants, shrubs and grass on or adjacent to the premises, which, as determined by Owner, do not reasonably <br /> interfere with the performance of the work. Contractor shall be responsible for damage to any such areas and <br /> vegetation and for unauthorized cutting of trees and vegetation. Contractor shall leave all adjacent property in <br /> as good condition as it was prior to beginning of the Contract. All cost in connection with any repairs or <br /> restoration necessary or required as a result of damage shall be borne by Contractor. <br /> Where practical, Contractor shall erect a temporary fence around the work site. Contractor shall <br /> prepare and maintain accurate reports of incidents of loss,theft or vandalism and shall furnish these reports to <br /> Owner wither three (3) days of each incident. <br /> Until final acceptance of the work by the Owner, the Contractor shall have full and complete charge or <br /> and shall bear all risk of loss of, and injury or damage to, the work performed under this Contract, or any <br /> portion thereof, including materials, Owner-furnished supplies and equipment, from any cause whatsoever. <br /> Contractor shall rebuild, repair, restore and make good any damages, injury, or loss to the work and to the <br /> property of the Owner or third parties, except such as may be directly due to errors in the Contract documents <br /> which the Contractor did not or could not have discovered through due diligence, or caused by agents or <br /> employees of the Owner, unless such loss or damage would be covered by any policy of insurance maintained <br /> by the Contractor. <br /> GC 21 UTILITIES <br /> The Contractor shall, at its expense, arrange for, develop and maintain all utilities in work areas, <br /> including, but not limited to: construction power, water as required throughout construction, and telephone <br /> service, if needed. Prior to final acceptance of the work,Contractor shall,at its expense, remove all temporary <br /> utilities. Contractor shall conduct its operations so as not to damage, close or obstruct any utility installation, <br /> highway, road or other property until permits therefore have been obtained. <br /> GC 22 DELIVERY UNLOADING AND STORAGE <br /> Contractor shall, at its expense, receive, unload, store in a secure place, and deliver from storage to <br /> the construction site, all materials, plant and equipment required for the performance of the Contract. Material <br /> and equipment subject to degradation by outside exposure shall be stored in a weather-tight enclosure <br /> provided by Contractor at its expense. <br /> GC 23 FIRE PROTECTION <br /> All necessary precautions to avoid and eliminate fire hazards shall be the responsibility of the <br /> Contractor. Contractor shall provide portable fire extinguishers, properly labeled, located and compatible with <br /> the hazard of each work area and shall instruct personnel in their use. <br /> GC 24 ILLUMINATION <br /> When any work is performed when daylight is obscured or at night, Contractor shall, at its expense, <br /> provide artificial light sufficient to permit work to be carried on satisfactorily and safely. <br /> GC 25 DUST CONTROL <br /> For the duration of the contract, the Contractor shall, at its expense, maintain all excavations, roads, <br /> plant sites, borrow areas and all other work areas free from dust. Code-required or industry-accepted <br /> 34 <br />