My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
methods of dust control suitable for the area involved and approved by Owner will be permitted. <br /> GC 26 POLLUTION CONTROL <br /> Contractor shall, at its expense, perform its work so as not to discharge into the atmosphere,any body <br /> of water, the ground or groundwater, from any source, smoke, dust or other contaminants in violation of the <br /> laws, rules and regulations of all federal, state and local air and water pollution requirements. Contractor shall, <br /> at its expense, provide suitable facilities to prevent any such discharges. Contractor shall immediately report <br /> to Owner and appropriate authorities any spill of contaminant. <br /> GC27 DEBRIS DISPOSAL <br /> All debris shall be legally disposed of at licensed disposal site(s). <br /> GC 27 EXPLOSIVES AND HAZARDOUS MATERIALS <br /> Contractor shall obtain all required federal, state and local permits and licenses and shall be <br /> responsible for the safe and proper handling, transportation, storage and use of any explosive or hazardous <br /> material brought onto or encountered with in the site. The Contractor will notify the Owner immediately if <br /> explosive or hazardous materials are encountered on the site. Contractor shall maintain and post as <br /> necessary, Material hazard Data Sheets for all applicable hazardous materials used in the course of the work. <br /> In the event that hazardous material is improperly handled or stored by the Contractor or its sub-contractors, <br /> which results in contamination of the site, Contractor shall immediately notify the Owner and the appropriate <br /> governmental authority and shall take whatever action is necessary or desirable to remediate the <br /> contamination at the Contractor's sole cost and expense. Contractor shall indemnify and hold harmless the <br /> Owner from any expense, action or liability resulting from such contamination and remedial actions. <br /> GC 28 LABOR <br /> Contractor shall employ only competent and skilled personnel to perform the work. Contractor shall, if <br /> requested by Owner, remove from the jobsite any personnel of Contractor who is determined by Owner to be <br /> unfit or working in violation of any provision of the Contract. Contractor and all subcontractors shall be bound <br /> by and comply with all applicable Federal, State and local laws regarding labor. All work performed after <br /> regular working hours, on Sundays or legal holidays, shall be performed without additional expense to the <br /> Owner. <br /> GC 29 SAFETY <br /> The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions <br /> and programs in connection with the work. Contractor will provide to each worker on the job site the proper <br /> safety equipment for the duties being performed by the worker and will not permit any worker on the job site <br /> who fails or refuses to use the safety equipment. The Contractor shall provide and maintain all necessary <br /> watchmen, barricades, warning lights, and signs and take all necessary precautions for the protection of all <br /> persons involved in the work, the public, and all employees or representatives of Owner. All work and all <br /> equipment, machinery, materials and tools shall be in compliance with and conform to all applicable laws, <br /> ordinance, rules and regulations. <br /> GC 30 PROGRESS <br /> During construction, Contractor shall keep a marked-up and up-to-date set of drawings showing as- <br /> built conditions on that site as an accurate record of all deviations between work as shown and work as <br /> installed. These drawings shall be available to Owner and Engineer for inspection at any time. <br /> During construction, Contractor shall keep a marked-up and up-to date set of specifications showing <br /> as-is conditions on the site annotated to clearly indicate all substitutions or product selections that are <br /> incorporate into the work. These specifications shall be available to Owner and Engineer for inspection at any <br /> time. <br /> If at any time Contractor's actual progress is inadequate to meet the requirements of the Contract, <br /> Owner may so notify Contractor who shall thereupon, at its expense, take such steps as may be necessary to <br /> improve its progress to meet the approved schedule. If within a reasonable period as determined by Owner, <br /> Owner determines that Contractor is not prosecuting its work with such diligence as will assure completion <br /> with the times scheduled, the Owner may declare a default of this Contract. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.