A bond rider from the Surety shall be submitted to the County with each change order that increases <br /> the Contract price. <br /> GC 38 USE OF COMPLETED PORTIONS. <br /> The Owner shall have the right to take possession of and use any substantially completed portions of <br /> the work. Such use by Owner shall not be construed as constituting final acceptance, and shall neither relieve <br /> Contractor of any of its responsibilities under the Contract, nor act as a waiver by Owner of any contract <br /> provisions; provided that the Contractor shall not be liable for any repair or maintenance required due to <br /> ordinary wear and tear resulting from such use. However, if such use increases the cost or delays the <br /> completion of remaining portions of work, Contractor shall be entitled to an equitable adjustment under the <br /> contract. <br /> GC 39 CLEANING UP. <br /> Upon completion of any portion of the work, the Contractor shall remove at his own expense from the <br /> Owner's property all temporary structures, equipment and surplus materials not required for later stages of <br /> work, rubbish, and waste materials resulting from his operations. Contractor shall make its own <br /> arrangements, at its own cost, for disposal of rubbish and waste materials. The Owner reserves the right to <br /> retain any surplus or salvage materials. <br /> CG 40 BASIC REQUIREMENTS PRIOR TO SUBSTANTIAL COMPLETION <br /> The following items shall be completed as a condition precedent to substantial completion and prior to <br /> a request by the Contractor for inspection for substantial completion. In the event the Contract does not define <br /> substantial completion, the following are also conditions for final completion and acceptance: <br /> 1. All general construction completed and the project components shall be clean and all <br /> systems fully functional. <br /> 2. All mechanical and electrical work substantially complete, fixtures in place, connected, <br /> cleaned and ready for use. <br /> 3. All electrical circuits shall be scheduled in panels and all panels and disconnect switches <br /> properly labeled. <br /> 4. Issuance of all permits and certificates, inspections, and other approvals and releases by <br /> governing authorities required for Owner's occupancy and use of the project. <br /> 5. Project site shall be cleared of Contractor's excess equipment and/or supplies and material. <br /> 6. All sets of operation and maintenance manuals for all equipment shall have been submitted, <br /> as referenced in the technical specifications. <br /> 7. Manufacturers' certifications and warranties shall be delivered to Owner. <br /> 8. All operations and maintenance manuals for all equipment shall be delivered to Owner. <br /> 9. All required spare parts, as well as any special devises and tools shall be delivered to Owner. <br /> 10. All keys and blanks shall have been provided. <br /> 11. Punch list of items required to render the construction services complete, satisfactory and <br /> acceptable to the Owner. If the Contract provides for a multi-phased or multi-structure project, a punch list <br /> must be developed for each phase or structure. <br /> Contractor shall arrange a joint site and project inspection(s) with Engineer for inspection for <br /> substantial completion and development of a punch list for the completion of construction services. Said <br /> punch list shall be prepared not later than thirty (30) days after the inspection for substantial completion. <br /> Punch list items recorded as a result of inspections for substantial completion shall be corrected by the <br /> Contractor prior to any request for final inspection and acceptance. <br /> If substantial completion is not obtained at the inspection called by Contractor,for reasons which are <br /> the fault of Contractor, any additional cost to Owner for the Engineer or design professional for any <br /> subsequent inspections for the purpose of determining substantial completion shall be the responsibility of the <br /> Contractor and shall be assessed against the final payment application. <br /> GC 41 FINAL INSPECTION AND ACCEPTANCE <br /> The following items shall be completed as a condition precedent to a request by Contractor for final <br /> inspection: <br /> 38 <br />