1. Completion of all punch list items recorded from the substantial completion inspection. <br /> 2. A complete set of mylar or paper marked-up as-builts with"RECORD"or"AS BUILT"clearly <br /> printed on each sheet along with one copy on AutoCAD CD Release 14 or better on State Plane Coordinates. <br /> Contractor shall accurately and neatly transfer all deviations from progress as-builts to final as-builts. As-built <br /> records shall include drawings signed and sealed by a registered land surveyor certifying the elevation and <br /> location of improvements. Certified drawings are to show locations, lines and grade of buried pipe line four(4) <br /> inches or larger in diameter and exterior to buildings, and other buried facilities (e.g. valves, tanks, vaults, <br /> storm inlets, ducts, etc.) installed or discovered as a result of the work. Certified drawings are to show building <br /> corners, sidewalks, paved areas and the location of all above ground structures within the project site. <br /> Contractor shall sign each final record drawing and note thereon that the final as-builts are complete and <br /> accurate. <br /> 3. A complete set of marked-up specifications with"RECORD"or"AS-BUILT"clearly printed on <br /> the cover. Contractor shall accurately and neatly transfer all deviations from progress specifications to final <br /> as-builts. <br /> 4. A signed and notarized affidavit indicating that no asbestos containing materials were used or <br /> installed during the course of the work. <br /> 5. A list of each piece of equipment having an individual value of$500 or greater. The list shall <br /> include, at a minimum, the name, make and model number, quantity installed, value of equipment. <br /> Contractor shall inform Owner in writing that work is ready for final inspection. The Engineer will, <br /> within five (5) business days, make such inspection. When Engineer finds the work acceptable under the <br /> Contract and all contract terms and conditions fully performed, Engineer shall issue a Final Certification to <br /> Owner. <br /> GC 42 EXTENSION OF TIME. <br /> The time limit for the completion of the work as described in the Contract is of the essence of this <br /> Contract. Contractor must request an extension of the contract completion date in writing and must provide <br /> the following information within seven(7)days of commencement of the delay. Contractor acknowledges that <br /> the evaluation of time extensions will be based on the following information: <br /> 1. All schedule updates, submittals and other conditions of the Contract have been met; <br /> 2. The delay is beyond the control of the Contractor and subcontractors and due to no <br /> direct or indirect fault of the Contractor. <br /> 3. Nature of the delay. <br /> 4. Dates of commencement/and end of delay. <br /> 5. Evidence that the delayed work results in a direct delay to the schedule critical path. <br /> 6. List of tasks/work affected by the delay. <br /> 7. Anticipated extent of delay. <br /> 8. Recommended action to minimize delay. <br /> 9. The Contractor has used all the float time available for the work involved in the delay <br /> request. <br /> Time extensions for weather delays will only be considered if all float time is exhausted prior to the weather <br /> occurrence. Failure of Contractor to timely request a time extension constitutes a waiver by Contractor and a <br /> denial of a time extension. <br /> If the Contractor is delayed at any time in the progress of the work by any act or neglect of the Owner,or if any <br /> employee of the Owner or by any separate Contractor employed by the Owner or by any changes ordered in <br /> the work, by labor disputes, fire, or unusual delay in transportation, unavoidable casualties or any causes <br /> beyond the Contractor's control or by delay authorized by the Owner pending resolution of disputes,and such <br /> delay extends the Project completion date, Substantial Completion shall be extended by Change Order for <br /> such reasonable time as the Owner may determine. <br /> GC 43 NO DAMAGES FOR DELAY; EXCLUSIVE REMEDY. <br /> The Contractor expressly agrees that a change order for an extension of the project completion date <br /> and substantial completion date constitutes its sole and exclusive remedies for efficiency or other related time <br /> or impact-based claims(hereinafter collectively"delay")or for delay attributable to any foreseen or unforeseen <br /> condition, or for delays claimed to be the result of active, intentional, knowing or passive interference by the <br /> 39 <br />