My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner, Engineer, or agents of either, and waives claims for any and all damages which it may suffer by <br /> reason of such claims, including but not limited to, lost profits, loss or impairment of bonding capacity, <br /> destruction of business, overhead, supervision, extended unabsorbed home office overhead, increase <br /> insurance costs, lost profits on alternate or unperformed contracts. Contractor hereby affirms that an <br /> extension of time is the Contractor's sole and exclusive remedy. Apart from extension of time, no payment of <br /> claim for damages shall be made to the Contractor as compensation for damages for any delays in the work, <br /> whether such delay be avoidable or unavoidable. <br /> GC 44 PAYMENT PROCEDURE. <br /> GC 44.1 Contractor's invoices shall reference the bid number. Submittals of estimates and <br /> invoices for payment must be directed to: Indian River County—Engineering Division. The County <br /> will not be responsible for any delay in payment at the County if Contractor submits his estimate and <br /> invoice to any other address. <br /> GC 44.2 Initial Payment. Prior to submittal of its initial payment request, Contractor shall <br /> have submitted the following items to the Engineer: <br /> 1. List of Subcontractors and suppliers <br /> 2. Project schedule <br /> 3. Schedule of values <br /> 4. All current certificates of insurance <br /> 5. Designation of Contractor's Project Manager <br /> GC 44.3 Progress Payments. Not more than once each month,the Contractor shall prepare <br /> and submit a detailed estimate and payment request on the Contractor's Application for Payment <br /> provided in Section 00622, covering the percentage of the total amount of the Contract which has been <br /> completed from the start of the job up to and including the last day of the preceding month, together with <br /> such supporting evidence as may be required by the Owner and/or the Engineer. This estimate shall also <br /> include the cost of such materials and equipment required in the permanent work as has been delivered <br /> to the site and suitably protected but not as yet incorporated in the work. Partial Release(s)of Lien and <br /> Subcontractor Utilization Report shall be submitted with each payment requisition to verify payment(s)to <br /> subcontractors and material suppliers. <br /> GC 44.4 In accordance with the Local Government Prompt Payment Act, until the Project is <br /> determined to be 50% complete, the Owner shall withhold retainage of ten percent (10%) from each <br /> progress payment pay to the Contractor based on the Contractor's estimate and invoice as approved by <br /> the Engineer. It is agreed that the Engineer shall have the right to finally determine the amount currently <br /> due to the Contractor. <br /> GC 44.5 After the Project is determined to be 50% complete, the Owner shall withhold <br /> retainage of five percent (5%) from each progress payment pay to the Contractor based on the <br /> Contractor's estimate and invoice as approved by the Engineer. It is agreed that the Engineer shall have <br /> the right to finally determine the amount currently due to the Contractor. Contractor may present to <br /> Owner a payment request for up to one-half of the retainage held by Owner. If Owner has grounds under <br /> Florida law to continue to retain all or a portion of the requested retainage, Owner may continue to hold <br /> such retainage. <br /> GC 44.5 Final payment may be made to certain select Sub-contractors whose work is <br /> satisfactorily completed prior to the total completion of the Project but only upon advance written approval <br /> of the Owner and Surety. <br /> GC 44.6 If there remain items to be completed,the Contractor and Owner shall list those items <br /> required for completion and the Contractor shall require the retainage of a sum equal to 200% of the <br /> estimated cost of completing any unfinished items, provided that said unfinished items are listed <br /> separately and the estimated cost of completing any unfinished items likewise listed separately. <br /> GC 44.7 The Contractor shall timely pay and not withhold payments to Sub-Contractors if such <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.