My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br /> A. The CONTRACTOR shall be responsible for and make good all damage to <br /> pavement beyond the limits of this Contract, buildings, telephone or other <br /> cables, water pipes, sanitary pipes, or other structures which may be <br /> encountered, whether or not shown on the Drawings. <br /> B. Information shown on the Drawings as to the location of existing utilities has <br /> been prepared from the most reliable data available to the Engineer. This <br /> information is not guaranteed, however, and it shall be this CONTRACTOR's <br /> responsibility to determine the location, character and depth of any existing <br /> utilities. He shall assist the utility companies, by every means possible to <br /> determine said locations. Extreme caution shall be exercised to eliminate any <br /> possibility of any damage to utilities resulting from his activities. <br /> 1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br /> A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br /> boxes, inlets and similar structures in the areas of construction that are to <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> with the surface of the finished work. <br /> B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing. CONTRACTOR shall make available survey reference markers to <br /> the various utility companies. <br /> + + END OF SECTION + + <br /> 01541-5 F:\PublicWorks\ENGINEERING DIVISION <br /> PROJECTS\084513 - Old Dixie Hwy Sidewalk (38th Ln - 45th St)\Admim\bid documents\Master Contract <br /> Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.