My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01550 <br /> ACCESS ROADS, PARKING AREAS <br /> AND USE OF PUBLIC STREETS <br /> 1.1 GENERAL <br /> A. Provide all temporary construction roads, walks and parking areas required <br /> during construction and for use of emergency vehicles. Design and maintain <br /> temporary roads and parking areas so they are fully usable in all weather <br /> conditions. <br /> B. Prevent interference with traffic and the OWN ER's operations on existing roads. <br /> Indemnify and save harmless the OWNER from any expenses caused by <br /> CONTRACTOR's operations over these roads. <br /> C. Roadways damaged by CONTRACTOR shall be restored to their original <br /> condition by the CONTRACTOR subject to approval of the OWNER or <br /> ENGINEER. <br /> D. Remove temporary roads, walks and parking areas prior to final acceptance and <br /> return the ground to its original condition, unless otherwise required by the <br /> Contract Documents. <br /> 1.2 USE OF PUBLIC STREETS <br /> The use of public streets and alleys shall be such as to provide a minimum of <br /> inconvenience to the public and to other traffic. Any earth or other excavated <br /> material spilled from trucks shall be removed immediately by the CONTRACTOR <br /> and the streets cleaned to the satisfaction of the Owner. <br /> 1.3 USE OF PUBLIC STREETS FOR HAUL ROADS <br /> A. Prior to construction, the CONTRACTOR shall designate all proposed haul <br /> roads to be used during the life of the project. Any earth or other materials <br /> spilled from trucks shall be removed by the CONTRACTOR and streets <br /> cleaned to the satisfaction of the Owner. He further shall be responsible for <br /> repairs to any damages caused by his operations, prior to final payment. <br /> 01550 Access Roads <br /> 01550-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)Wdmim\bid documents\Master <br /> Contract Documents\01550- Access Roads.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.