Laserfiche WebLink
SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1.1 GENERAL <br /> A. Make all arrangements for transportation, delivery and handling of equipment <br /> and materials required for prosecution and completion of the Work. <br /> B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br /> to the site only during regular working hours. Shipments shall be addressed and <br /> consigned to the proper party giving name of Project, street number and city. <br /> Shipments shall not be delivered to OWNER except where otherwise directed. <br /> C. If necessary to move stored materials and equipment during construction, <br /> CONTRACTOR shall move or cause to be moved materials and equipment <br /> without any additional compensation. <br /> 1.2 DELIVERY <br /> A. Arrange deliveries of products in accord with construction schedules and in <br /> ample time to facilitate inspection prior to installation. <br /> B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following: <br /> 1. Work of other contractors, or OWNER. <br /> 2. Limitations of storage space. <br /> 3. Availability of equipment and personnel for handling products. <br /> 4. OWNER'S use of premises. <br /> C. Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER. <br /> D. Do not have products delivered to site until required storage facilities have been <br /> provided. <br /> E. Have products delivered to site in manufacturer's original, unopened, labeled <br /> containers. Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work. <br /> 01610-1 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master <br /> Contract Documents\01610-Transportation and Handling of Materials and Equipment.doc <br />