My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br /> SUBSTITUTIONS <br /> 1.1 GENERAL <br /> A. Requests for review of a substitution shall conform to the requirements of <br /> Article 6.05, "Substitutes and Or-Equals," of the General Conditions, and shall <br /> contain complete data substantiating compliance of the proposed substitution <br /> with the Contract Documents. <br /> 1.2 CONTRACTOR'S OPTIONS <br /> A. For materials or equipment (hereinafter products) specified only by reference <br /> standard, select product meeting that standard by any manufacturer, fabricator, <br /> supplier or distributor (hereinafter manufacturer). To the maximum extent <br /> possible, provide products of the same generic kind from a single source. <br /> B. For products specified by naming several products or manufacturers, select any <br /> one of the products or manufacturers named which complies with Specifications. <br /> C. For products specified by naming one or more products or manufacturers and <br /> stating "or equivalent," submit a request for a substitution for any product or <br /> manufacturer which is not specifically named. <br /> D. For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted, there is no option and no <br /> substitution will be allowed. <br /> E. Where more than one choice is available as a CONTRACTOR's option, select <br /> product which is compatible with other products already selected or specified. <br /> 1.3 SUBSTITUTIONS <br /> A. During a period of 15 days after date of commencement of Contract Time, <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of <br /> products or manufacturers, and construction methods (if specified). <br /> 1. After end of specified period, requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR. <br /> B. Submit 5 copies of Request for Substitution. Submit a separate request for each <br /> substitution. In addition to requirements set forth in Article 6.05 of General <br /> Conditions, include in the request the following: <br /> 1. For products or manufacturers: <br /> a. Product identification, including manufacturer's name and address. <br /> b. Manufacturer's literature with product description, performance and <br /> test data, and reference standards. <br /> 01630-1 01630 Substitutions <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master <br /> Contract Documents\01630-Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.