My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Samples, if appropriate. <br /> d. Name and address of similar projects on which product was used, <br /> and date of installation. <br /> 2. For construction methods (if specified): <br /> a. Detailed description of proposed method. <br /> b. Drawings illustrating method. <br /> 3. Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product, manufacturer or method <br /> specified. <br /> C. In making Request for Substitution, CONTRACTOR represents that: <br /> 1. CONTRACTOR has investigated proposed substitution, and deter- <br /> mined that it is equal to or superior in all respects to the product, <br /> manufacturer or method specified. <br /> 2. CONTRACTOR will provide the same or better guarantees or <br /> warranties for proposed substitution as for product, manufacturer, or <br /> method specified. <br /> 3. CONTRACTOR waives all claims for additional costs or extension of <br /> time related to a proposed substitution that subsequently may become <br /> apparent. <br /> D. A proposed substitution will not be accepted if: <br /> 1. Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents. <br /> 2. It will delay completion of the Work, or the work of other contractors. <br /> 3. It is indicated or implied on a Shop Drawing and is not accompanied by <br /> a formal Request for Substitution from CONTRACTOR. <br /> E. If the ENGINEER determines that a proposed substitute is not equal to that <br /> specified, furnish the product, manufacturer, or method specified at no additional <br /> cost to OWNER. <br /> F. Approval of a substitution will not relieve CONTRACTOR from the requirement <br /> for submission of Shop Drawings as set forth in the Contract Documents. <br /> G. The procedure for review by Engineer will include the following: <br /> 1. Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR. <br /> 2. Upon receipt of an application for review of a substitution, Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item. <br /> 3. If the substitution will not require a more extensive review, Engineer will <br /> proceed with the review without additional cost to CONTRACTOR. <br /> 01630-2 01630 Substitutions <br /> F:\PublicWorks\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)1Admim\bid documents\Master <br /> Contract Documents\01630-Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.