Laserfiche WebLink
SECTION 01820 <br /> Post Final Inspection <br /> 1.1 GENERAL <br /> A. Approximately one year after Final Completion, the OWNER will make <br /> arrangements with the Construction Coordination Manager and the <br /> CONTRACTOR for a post final inspection and will send a written notice to said <br /> parties to inform them of the date and time of the inspection. <br /> B. Corrections of defective work noted by OWNER and Construction Coordination <br /> Manager shall comply with the applicable sections of Article 13, General <br /> Conditions. <br /> C. After the inspection, the OWNER will inform the CONTRACTOR of any <br /> corrections required to release the performance and payment bonds. <br /> * * END OF SECTION <br /> 001820-Post Final Inspection rev 05-13.doc <br /> 001820- 1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract Documents\001820-Post <br /> Final Inspection rev 05-13.doc <br />