Laserfiche WebLink
G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only <br /> those cleaning materials which will not create hazards to health or <br /> property and which will not damage the surfaces. Use cleaning materials <br /> only on those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times. <br /> I. Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR's expense, spray water or other dust control <br /> agents over the areas, which are producing the dust. Schedule <br /> construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces. <br /> 1.3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion, the OWNER, ENGINEER, and CONTRACTOR shall <br /> review the site with regards to site cleanup and restoration. Clean and/or restore <br /> all items determined to be unsatisfactory by the OWNER or ENGINEER, at no <br /> additional expense. <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract <br /> Documents\01710-Site Cleanup.doc <br />