Laserfiche WebLink
3. All final Elevations to be plotted on PGL AND Plan & Profile sheets as <br /> applicable. <br /> 4. Elevations of edge of pavement and flow line at curb inlets and on the adjacent <br /> edge of pavement at curb inlets. <br /> WATER, FORCE, AND RECLAIMED WATER MAINS: <br /> 1. Show size and type of material used to construct mains. <br /> 2. Show horizontal location and elevation of all tees, crosses, bends, terminal <br /> ends, valves, fire hydrants, air release valves, and sampling points, etc., by <br /> distances from known reference points. <br /> 3. Show location, size and type of material of all sleeves and casing pipes. <br /> 4. Elevation and horizontal location of all storm sewers, gravity sewers including <br /> laterals, force mains, water mains, etc. which are crossed; including <br /> clearance dimension at all conflicts or crossings. <br /> 5. Top of pipe elevation and horizontal location of all water and force main stub- <br /> outs. <br /> 6. Horizontal location of all services at the property lines. <br /> 7. Horizontal and vertical location of pipe including size of all mains and ground <br /> elevation shall be obtained at one-hundred (100) foot intervals. Contractor <br /> shall place temporary PVC stand pipes (tell-tales) at each of the one- <br /> hundred (100) foot intervals and at all fittings and conflicts/crossings to <br /> facilitate the record drawing survey. The tell-tale pipes shall be constructed <br /> of 2-inch PVC pipe, shall be placed on the top of the pipes to be surveyed, <br /> and shall be removed by the Contractor after completion of the field survey <br /> by the "As-Built" Professional Surveyor. <br /> 8. Location of fire lines. <br /> 9. Dedicated easement locations, identified by O.R. Book and Page Number. <br /> GRAVITY SEWER: <br /> 1. Manholes: Elevation of top rim, bottom elevation and invert of each influent <br /> and effluent line. <br /> 2. Show distance between manholes center-to-center and horizontal location by <br /> baseline station and offset. <br /> 3. Show material size and type used to construct sewer mains. <br /> 4. Show length (center of manhole to end of stub) distances from known <br /> reference points or baseline offsets, and elevation of stub-outs. <br /> 5. Show which services have twenty (20) foot length of DIP at water main <br /> crossings. <br /> 6. Show station and offset location of sanitary services' at property line. <br /> Particular care in dimensioning needed in special situations, i.e., cul-de-sacs <br /> and locations where services are not perpendicular to wye. <br /> 7. Show invert elevation of sanitary service at property line. <br /> 8. Any and all necessary dedicated easement locations, identified by O.R. Book <br /> and Page Number. <br /> 01025-4 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)Wdmim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />