Laserfiche WebLink
01340 — Submittal of Shop Drawings <br /> 1.5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS, PRODUCT DATA AND SAMPLES <br /> A. The CONTRACTOR's responsibilities for submittal of shop drawings, <br /> product data, and samples are set forth in paragraph 6.17 of the General <br /> Conditions and as further explained herein. <br /> B. Prior to submission, thoroughly check shop drawings, product data, and <br /> samples for completeness and for compliance with the Contract <br /> Documents, verify all dimensions and field conditions, and coordinate the <br /> shop drawings with the requirements for other related work. Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means, methods, techniques, <br /> sequences and operations of construction, safety precautions and <br /> programs incidental thereto, all of which are the CONTRACTOR's <br /> responsibility. <br /> 1. It is CONTRACTOR'S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents. <br /> 2. Incomplete or inadequate submittals will be returned for revision <br /> without review. <br /> C. The CONTRACTOR's responsibility for errors and omissions in submittals <br /> is not relieved by the ENGINEER's review of submittals. The <br /> CONTRACTOR shall approve the shop drawings based on his in-the-field <br /> measurements, prior to submittal to the ENGINEER for his review. <br /> D. Notify the ENGINEER, in writing at the time of submission, of deviations in <br /> submittals from the requirements of the Contract Documents. The <br /> CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER's review of submittals, unless the ENGINEER gives written <br /> acceptance of specific deviations. <br /> E. Begin no work, which requires submittals until return of submittals with the <br /> ENGINEER's stamp and initials or signature indicating the submittal has <br /> been reviewed. <br /> 01340-Submittal of Shop Drawings.doc <br /> 01340-2 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)Wdmim\bid documents\Master Contract <br /> Documents\01340-Submittal of Shop Drawings doc <br />