Laserfiche WebLink
General Requirements: Materials, equipment and workmanship shall <br /> conform to the applicable portions of the codes, specifications, standards and <br /> statutes listed below: <br /> National Fire Protection Association: <br /> NFPA No. 70 National Electrical Code <br /> Local Codes: <br /> At the place of the work, all applicable local codes, <br /> regulations and ordinances that are in effect will apply. <br /> National Electrical Manufacturers Association: <br /> AB 1 Circuit Breakers— Molded Case <br /> FB 1 Conduit Fittings, Cable Fittings and <br /> Accessories <br /> IC 1 Industrial Control <br /> SGB 1 Connectors— Electric Power <br /> KS 1 Enclosed Switches <br /> PB 1 Panel boards <br /> TR 1 Transformers <br /> SG 8.2 Connectors for Copper Conductors <br /> IC 4 Industrial Enclosures <br /> WC 5 Thermoplastic— Insulated Wire &Cable <br /> American National Standards Institute: <br /> C80.1 Rigid Steel Conduit <br /> C6.1 Terminal Markings for Electrical Apparatus <br /> Underwriters' Laboratories, Inc. <br /> Standards for Cabinets and Boxes <br /> Standards for Service Equipment <br /> Standard for Industrial Control Equipment <br /> Standard for Thermoplastic-Insulated Wire <br /> Illuminating Engineering Society: <br /> IES Lighting Handbook <br /> United States Federal Government: <br /> Williams—Steiger Occupational Safety and Health Act <br /> of 1970 (OSHA) <br /> Special Requirements: <br /> Phase rotation of electrical service shall be: L1, L2, L3 (A, B, C) left to right <br /> when facing equipment. <br /> 16-15 <br /> Ito. <br />