My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-197A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-197A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:55:08 PM
Creation date
3/23/2016 8:39:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
10/01/2013
Control Number
2013-197A
Agenda Item Number
8.H.
Entity Name
Metropolitan Planning Organization
Subject
Transit Development Plan
GoLine Transit
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000009\S0002YB.tif
Meeting Body
No data from migration
Meeting Type
NA
SmeadsoftID
12337
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 3-20 shows that GoLine's operating expenses increased 52 percent over the five-year <br />trend period, which is consistent with the increased levels of sei vice provided. Even with the <br />large increase, GoLine still ranked last among the peer group and 26.4 percent below the peer <br />median which are both positive measures. <br />Source: National Transit Database 2006-2010 <br />Figure 3-20 Operating Expense (in thousands $) <br />As a subset of total operating expenses, GoLine's maintenance expenses increased 254 <br />percent. With an increase of approximately 140 percent in vehicle miles of service, an <br />increase in maintenance expenses is expected. Even with the maintenance expense increases, <br />GoLine still compared favorably to the peer systems at 35.7 percent below the peer median. <br />3-21 <br />Itm Stanley Consultants -{ <br />
The URL can be used to link to this page
Your browser does not support the video tag.