Laserfiche WebLink
Table 3 <br /> JULY 2014 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> Task 3A:Field Activities-Soil Sampling <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> Principal hr $216 0 $0 <br /> Associate hir $204 0 $0 <br /> Senior Project Geologist hr $179 8 $1,432 <br /> Project Engineer hr $147 0 $0 <br /> Geologist hr tbto <br /> 10tS5,3'189 <br /> 0 <br /> Senior Staff Geologist hr 655 <br /> Staff Geologist hr 0 <br /> Suessional Se7 <br /> Site Manager/Construction Manager hr 0Senior Engineering Technician hr 655Designer/GIS hr 0Drafter/CADD Operator hr <br /> 0Technical/Administrative Assistant hr 0Technical Word Processor hr 0Clericalhr 1Subtotal Techniistrative Se <br /> VOC Analysis each $73 10 $728 <br /> SVOC Analysis (ine 3 Ebs) each $139 41 $5,703 <br /> RCRA Metals Analysis line 3 Ebs) each $70 41 $2,852 <br /> PAHs Analysis each $139 27 $3,756 <br /> Arsenic Analysis each $t9 9 $173 <br /> EPA 8141 Analysis each $102 10 $1,017 <br /> EPA 8081 Analysis each $75 t0 $749 <br /> EPA 8151 Analysis each 1 $91 10 $910 <br /> Subtotal Subcontractor Services $15,886 <br /> Lodging day $101 10 $1,010 <br /> Per Diem day $51 10 $510 <br /> Communications Fee 3%labor 0.03 $15,376 $461 <br /> CADD Computer System hr $15 0 $0 <br /> Field Vehicle day $97 5 $485 <br /> 8.5'x1P Photocopies each $0.12 60 $7 <br /> Field Kit day $150 5 $750 <br /> Equipment Shipping each $75 2 $150 <br /> Subtotal Reimbursables $3,373 <br /> Notts: <br /> I. Lodging and per diem rales were taken from the GSA website far the Vero Beach area(wwwasa gov). <br /> 2. Monitoring Well Installation Kit includes:PID,water level indicawq GPS can,Feld geology kit,and multi-meter(pB,lempenanx, <br /> conductivity,nubidity,dissolved oxygen,and oxidation reduction potential),and miscellaneoua supplies. <br /> XR1405]-RBVxlax Gewyntee Coraultants <br />