Laserfiche WebLink
Table 4 <br /> JULY 2014 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> Task 3B:Field Activities-LFG <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> EM <br /> Principal hr $216 1 $216 <br /> Associate In $204 0 $0 <br /> Senior Project Geologist hr $179 2 $358 <br /> Project Engineer In $147 0 $0 <br /> Geologisthr $128 6 $768 <br /> Senior Staff Geologist hr $]1 <br /> 3 0 $0 <br /> Staff Geologist hr $96 0 $0 <br /> Subtotal Professional Services $1,342 <br /> Site Manager/Construction Manager hr $109 21 $2,289 <br /> Senior Engineering Technician hr $81 0 $0 <br /> Designer/GIS hr $129 0 $0 <br /> Drafter/CADD Operator hr $80 0 $0 <br /> Technical/Administrative Assistant hr $90 0 $0 <br /> Technical Word Processor hr $92 0 $0 <br /> Clerical hr 1 $54 1 $54 <br /> Subtotal Technical/Administrative Services $2,343 <br /> Bar Punch each $144 0 $0 <br /> Prepacked wells each $99 8 $792 <br /> Cas well drilling daily $1,350 1 $1,350 <br /> Surface Completions each $185 0 $0 <br /> Per Diem each $220 1 $220 <br /> Lab VOC air analysis each $350 3 $1,050 <br /> Gas meters(PID and GEM) day $250 2 $500 <br /> Decon each $165 1 $165 <br /> Subtotal Subcontractor Services $4,077 <br /> Lodging day $101 1 $101 <br /> Per Diem day $51 1 $51 <br /> Communications Fee 3%labor 0.03 $3,685 $Ill <br /> Field Vehicle day $97 2 $194 <br /> 8.5'x1 l"Photocopies each $0.12 60 $7 <br /> Field Kit day $150 2 $300 <br /> Equipment Shipping each $75 1 $75 <br /> Subtotal Reimbursables $839 <br /> Notes: <br /> 1, Lodging and per diem rates were taken from the GSA website for the Vero Beach a ea(www.gsa.gov). <br /> 2. Monitoring Well Installation Kit includes'.PID,water level indicator,GPS unit,field geology kit,and multi-mcter(pH,temperature, <br /> conductivity,turbidity,dissolved oxygen,and oxidation reduction potential),and miscellaneous supplies. <br /> XR14053-REV.xlsx Geosyntee Consultants <br />