My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
01/22/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:46:16 AM
Creation date
3/23/2016 8:55:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2013
Meeting Body
Board of County Commissioners
Book and Page
159
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MV.tif
SmeadsoftID
14201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br /> BOARD MEMORANDUM <br /> "ft- TO: Joseph A. Baird, <br /> County Administrator <br /> THROUGH: Christopher R. Mora, P.E. CW_.' <br /> Public Works Director <br /> FROM: James D. Gray, Jr. <br /> Coastal Engineer <br /> SUBJECT: Emergency Dune Stabilization Projects -Award of Contract <br /> Henry Fischer& Sons, Inc. <br /> DATE: January 15, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> On October 26, 2012, the eye of Hurricane Sandy passed approximately 200 miles east of Indian <br /> River County producing over 10-foot breaking waves along the coast and 20 to 30 feet waves <br /> offshore. As a result of the high surf, approximately 6-8 feet of dune retreat was experienced <br /> at a number of County maintained beach parks including; Wabasso Beach Park, Golden Sands <br /> Beach Park, Seagrape Trail Beach Park, and Tracking Station Beach Park. Seagrape Trail and <br /> Tracking Station Beach Park dunes have already been restored through separate emergency <br /> dune stabilization contracts and are not the subject of this agenda item. <br /> On January 11, 2013, staff solicited for two separate quotes, via e-mail to previously contracted <br /> sand miners, to restore eroded dunes at Wabasso Beach Park and Golden Sands Beach Park <br /> prior to the March 1, 2013 sea turtle nesting season. <br /> Summarized below are the 4 quotes received January 14, 2013 for each dune stabilization <br /> project. <br /> Emergency Dune Stabilization Project—Wabasso Beach Park <br /> Contractor Total Bid <br /> Henry Fischer& Sons, Inc. $40,562.50 <br /> Ranch Road Lake, LLC $42,187.50 <br /> Legacy One, Inc. $45,156.25 <br /> Ranger Construction Industries, Inc. $52,330.00 <br /> °�— FAPublic Works\JamesG\TS Sandy October 2012\Dune Stabilization Projects\Agenda Items\1-22-13 memo to bcc <br /> Emergency Dune Stabilization Project--Wabsso&Golden Sands.docx <br /> 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.