My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2013 (2)
CBCC
>
Meetings
>
2010's
>
2013
>
01/22/2013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:46:16 AM
Creation date
3/23/2016 8:55:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2013
Meeting Body
Board of County Commissioners
Book and Page
159
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MV.tif
SmeadsoftID
14201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Consent Agenda Item for January 22, 2013 <br /> Emergency Dune Stabilization Projects <br /> January 15, 2013 <br /> IVMW <br /> Emergency Dune Stabilization Proiect—Golden Sands Beach Park <br /> Contractor Total Bid <br /> Henry Fischer &Sons, Inc. $57,881.25 <br /> Ranch Road Lake, LLC $59,062.50 <br /> Legacy One, Inc. $63,218.75 <br /> Ranger Construction Industries, Inc. $72,935.00 <br /> Staff has reviewed all bid proposals and has determined that the lowest, most qualified quotes <br /> were submitted by Henry Fischer & Sons, Inc.; $40,562.50 for the Wabasso Beach Park Project <br /> and $57,881.25 for the Golden Sands Beach Park Project. <br /> The total estimated sand quantity for the Wabasso Beach Park Project is 2,500 cubic yards or <br /> 3,125 tons. The total estimated sand quantity for the Golden Sands Project is 3,500 cubic yards <br /> or 4,375 tons. <br /> Beach access for construction will be through Wabasso and Golden Sand Beach Parks. The <br /> closure of the parks will be necessary for construction activities and will be closely coordinated <br /> with the contractor to minimize disruption to the public. <br /> FUNDING <br /> Funding for this expenditure will be from the Beach Restoration Fund, Other Contractual <br /> Services, Account# 12814472-033490. <br /> F:\Public Works\JamesG\TS Sandy October 2012\Dune Stabilization Projects\Agenda Items\1-22-13 memo to bcc <br /> Emergency Dune Stabilization Project--Wabsso&Golden Sands.docx <br /> 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.