My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
01/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:47:48 AM
Creation date
3/23/2016 8:54:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/08/2013
Meeting Body
Board of County Commissioners
Book and Page
163
Subject
Greenway
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004BE.tif
SmeadsoftID
14193
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit#1 <br /> Amendment 1 to <br /> Work Order Number 3 <br /> Valve Actuator Additions to North RO Water Plant <br /> PROJECT DESCRIPTION <br /> This amendment#1 modifies Work Order#3 to include modifications to the North RO <br /> water plant permeate degasifier valves and dampers to allow automation of each. <br /> Automation will allow equipment to be taken off-line when not needed for treatment <br /> capacity and will reduce operating costs of the facility. The scope of work consists of <br /> design, modifications to the finish water stabilization (FWS) drawings to include these <br /> design changes,preparation of specifications, and bidding support needed to implement <br /> automation of the post-treatment system at the North RO water treatment plant. In <br /> summary,the additional scope of work in general, consists of. <br /> SCOPE OF SERVICES <br /> 1. Consultant will review existing process equipment at the North plant and evaluate <br /> options for implementing valve actuators on the permeate piping to each degasifier <br /> and air header dampers from each degasifier. The attached exhibit illustrates the <br /> locations where actuators are required. <br /> 2. Consultant will design improvements to the penneate degasifier inlet valve to <br /> include new valves and actuators in the degasifier inlets, and actuators and dampers <br /> on the air header system to allow isolation of individual degasifiers. Consultant <br /> will design a pressure relief system to prevent over-pressurizing of the permeate <br /> piping in case of valve failure. Consultant will design I&C improvements needed <br /> for each actuator, including power and instrumentation. <br /> Consultant will prepare revised drawings that illustrate the valve actuator <br /> improvements and include these drawings as an addendum to the finish water <br /> stabilization project currently being prepared for advertisement. Mechanical, <br /> electrical, and instrumentation drawings will be modified to include these changes. <br /> The drawings will be included as an addendum to the FWS project documents. <br /> 3. Consultant will prepare an operating logic and description for the sequencing of <br /> each of the valve and damper actuators. This description will need to be integrated <br /> within the existing plant operating logic and will be used by the contractors I&C <br /> integrator. <br /> 4. Consultant will provide construction phase and operation startup services of this <br /> element which will consist of review of submittals, coordination and oversight of <br /> implementation of the operational sequencing and integration of the existing PLC <br /> and HMI system, and observation of the operating sequence. <br /> K:\WPB_Civil\044572022-IRCU Stabilization\Scope\FW Stabilization North RO Plant Actuator Addition-Amd.#1 to <br /> WO 3.doc Page ] of 2 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.