My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
01/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:47:48 AM
Creation date
3/23/2016 8:54:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/08/2013
Meeting Body
Board of County Commissioners
Book and Page
163
Subject
Greenway
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004BE.tif
SmeadsoftID
14193
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may <br /> be required depending on circumstances that may arise during the execution of this project. <br /> Other items that may be considered additional services are mentioned herein. Additional <br /> services include, but may not be limited to the following: <br /> • SCADA programming <br /> INFORMATION PROVIDED BY OWNER <br /> The Owner shall provide the follow information related to the design of this project: <br /> • Electric Actuator vendors <br /> ATTACHMENT 1 - SCHEDULE <br /> Services for Task 1 through 3 are anticipated to be completed within 2 weeks of the notice <br /> to proceed. Task 4 will be concurrent with construction phase services and are anticipated <br /> to be completed within seven to eight months, depending on the contractors schedule. <br /> ATTACHMENT 2 - FEES <br /> We will provide these services in accordance with our Continuing Services Contract <br /> Agreement for Professional Services dated November 15, 2011, with Indian River County. <br /> The Consultant will provide these additional services for a lump sum fee as follows: <br /> Task No. Task Task Fee <br /> 1 Review Existing System $2,700 <br /> 2 Design & Prepare drawings/specifications $85500 <br /> 3 Prepare Operating Logic $3,500 <br /> 4 Coordination and Implementation phase $35000 <br /> Total Lump Sum Fee—= $17,700 <br /> K:\WPB_Civil\044572022-1RCU Stabilization\Scope\FW Stabilization North RO Plant Actuator Addition-Amd.#I to <br /> WO 3.doc <br /> Page 2 of 2 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.