My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/22/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:42:56 AM
Creation date
3/23/2016 9:04:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2013
Meeting Body
Board of County Commissioners
Book and Page
449
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NR.tif
SmeadsoftID
14232
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
screen(FlexRake),to be constructed under Task 313 <br /> 6. An automatic FlexRake, typically as manufactured by Duperon Corporation of Saginaw Michigan. The FlexRake <br /> facilitates capture and removal of harvested algae filaments, as well as continuous removal of sloughed algae and <br /> incidental solids5,to be constructed under Task 313 <br /> 7. StormwaterBrine Pipeline, a large diameter force main from the South Relief Canal Pump Station to the PC South <br /> Algal Nutrient Removal Facility Site, to be constructed under Task 3C. This pipeline will carry canal water to the <br /> ARNF. Another pipeline will carry brine from the South County RO Water Treatment Plant to the AKNF where it <br /> will mix with the canal water before flowing onto the ARNF. <br /> TASK NUMBER 3A <br /> TASK NAME: BMP Construction—South Relief Canal Pump Station <br /> TASK DESCRIPTION:319 grant funding will be utilized in part for construction of the South Relief Canal Pump Station. <br /> ALLOWABLE COSTS: The estimated contractual construction costs for the pump station and related components is <br /> $1,126,000, of which$563,000 maximum will be expended from 319 grant funds and $563,000 minimum is required match <br /> expenditure for the 319 grant funds. <br /> DELIVERABLES: 1) Dated color photographs of the site prior to and during construction and immediately following <br /> completion of the project;2)complete installation of the entire pump station;3)As-built certification for the pump station;4) <br /> electronic files of the as-built drawings completed by a professional land surveyor; and 5) signed statement from Grantee's <br /> project certified engineer indicating construction has been completed in accordance with approved design. <br /> PERFORMANCE STANDARD: The Department Grant Manager will review the photographs and certification of <br /> completion for all components by the Grantee's project certified engineer to verify that construction has been completed for <br /> all components in accordance with the approved plans. <br /> TASK NUMBER 3B <br /> TASK NAME: BMP Construction—PC South Algal Nutrient Removal Facility <br /> TASK DESCRIPTION: TMDL grant funding will be utilized in part for construction of the PC South Algal Nutrient <br /> r Removal Facility and its associated appurtenances and hardware. <br /> ALLOWABLE COSTS: The estimated contractual construction costs for the Algal Nutrient Removal Facility and related <br /> components is $5,426,847, of which $1,376,900 maximum will be expended from TMDL grant funds and $4,049,947 <br /> minimum is required match expenditure for the TMDL grant funds. <br /> DELIVERABLES: 1) Dated color photographs of the site prior to and during construction and immediately following <br /> completion of the project; 2) complete installation of the entire Algal Nutrient Removal Facility system per the project <br /> description; 3) As-built certification for the stormwater management system; 4) electronic files of the as-built drawings <br /> completed by a professional land surveyor; and 5) signed statement from Grantee's project certified engineer indicating <br /> construction has been completed in accordance with approved design. <br /> PERFORMANCE STANDARD: The Department Grant Manager will review the photographs and certification of <br /> completion for all components by the Grantee's project certified engineer to verify that construction has been completed for <br /> all components in accordance with the approved plans. <br /> TASK NUMBER 3C <br /> TASK NAME: BMP Construction—StormwaterBrine Pipeline <br /> TASK DESCRIPTION: TMDL grant funding will be utilized in part for construction of the StormwaterBrine Pipeline and <br /> their associated appurtenances and hardware. <br /> ALLOWABLE COSTS: The estimated contractual construction costs for these components is $1,164,853.40, of which <br /> $287,000 maximum will be expended from 319 grant funds and$877,853.40 minimum is required match expenditure for the <br /> 319 grant funds. <br /> DELIVERABLES: 1) Dated color photographs of the site prior to and during construction and immediately following <br /> completion of the project; 2) complete installation of the entire Algal Nutrient Removal Facility system per the project <br /> description; 3) As-built certification for the stormwater management system; 4) electronic files of the as-built drawings <br /> completed by a professional land surveyor; and 5) signed statement from Grantee's project certified engineer indicating <br /> construction has been completed in accordance with approved design. <br /> 5 In some cases in which high levels of suspended solids reduction is required,additional processes such as wedge wire <br /> screens,hydroscreens,or sand filters may be included to further polish the effluent after coarse screening through the Flex <br /> Rake. <br /> DEP Agreement No.G0353,Attachment A-1,Page 6 of 14 <br /> 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.