Laserfiche WebLink
PERFORMANCE STANDARD: The Department Grant Manager will review the photographs and certification of <br /> completion for all components by the Grantee's project certified engineer to verify that construction has been completed for <br /> all components in accordance with the approved plans. <br /> TASK NUMBER:4 <br /> TASK NAME: Public Education <br /> TASK DESCRIPTION: This task includes public presentations and construction of a nature trail with informational signs <br /> explaining the environmental benefits of the ATS system and methods for reducing nutrient loading into the receiving waters <br /> of the state. There is a video currently available for viewing at the dedicated stormwater educational website <br /> (www.irestonnwater.com) that describes nutrient removal projects the county has implemented to date, as well as an <br /> introduction to the PC South project. Walking trails and signage will be constructed, civic forums will be ongoing. An <br /> updated water quality improvement informational video will be produced to include the ATS Facility,to be broadcast on the <br /> IRC county public television station and couty's stormwater educational website. <br /> ALLOWABLE COSTS: Estimated cost of$54,000.00 for walking trail,signs and informational/educational video. All <br /> costs in this task are additional expenditures to be made by the Grantee,not required match. <br /> DELIVERABLES: Text and final draft video in electronic format for the website will be submitted to the DEP Grant <br /> Manager for prior approval before airing and distribution. Submission of CD's with the final Public Services <br /> Announcements released to the public with information on when they were aired. Link to the Indian River County website <br /> with information on updates made for the project. Dated photographs of the installed walking trails and signage,dates/sign-in <br /> sheets for when the civic forums are held. <br /> PERFORMANCE STANDARD: The DEP Grant Manager will review the draft and final deliverables to verify compliance <br /> with the Agreement's terms and conditions, the TMDL grant requirements and the Department's policies on public <br /> education,and will review evidence of the number of contacts made with the public through each component of the outreach <br /> task. <br /> TASK NUMBER: 5 <br /> TASK NAME:Monitoring <br /> TASK DESCRIPTION: The Grantee must complete and submit to the Department a Quality Assurance Project Plan <br /> (QAPP)for monitoring prior to commencement of any monitoring. The monitoring plan will specify the sampling locations, <br /> sampling instruments, and parameters to be sampled. The parameters shall include, but are not limited to: TN (lbs/yr), TP <br /> (lbs/yr), TSS (lbs/yr), Cd, Cr, Cu, Zn, NO2/NO3, TKN,NH3, Orthophosphate, Fecal coliform, rainfall and flow. Because <br /> the flow through the system is continuous, discrete sampling during rainfall events is meaningless. The flow will be <br /> monitored on a timed composite sampling basis during the one-year monitoring period. Monitoring is to be performed at <br /> inflow and outflow locations of each BMPs installed and in accordance with the approved QAPP. Sampling locations shall <br /> be recorded and verified using a GPS device. Project-specific details must be added during QAPP development. Harvested <br /> material shall be weighed wet with each harvest, either directly or by determining wet density and volume. Three (3) <br /> composite samples shall be analyzed for percent moisture, and these composited on a monthly basis for analysis for <br /> phosphorus,nitrogen,carbon,and ash. <br /> ALLOWABLE COSTS: The estimated contractual costs for the collection and lab analysis of monitoring events results is <br /> $200,000. All costs in this task are additional expenditures to be made by the Grantee,not required match. <br /> DELIVERABLES: Department approved QAPP and submission of monitoring results. Discussion of analysis of <br /> monitoring results and the pollutant load reductions from each applicable BMP either as a stand-alone Final Efficiency <br /> Evaluation Monitoring Report or as part of the Final Project Report. <br /> PERFORMANCE STANDARD: The Department Grant Manager will review the QAPP for compliance with this <br /> Agreement and DEP Standard Operating Procedures for monitoring; submission of approved QAPP; and submission of <br /> monitoring results. Review of Final Efficiency Evaluation Monitoring Report(or equivalent description in the Final Project <br /> Report)to verify that monitoring was completed in accordance with the approved QAPP and the results were analyzed and <br /> discussed regarding removal efficiency. <br /> TASK NUMBER:6 <br /> TASK NAME:Draft and Final Report <br /> TASK DESCRIPTION: The Grantee must complete and submit to the Department a Final Report, The Final Report is <br /> intended to capture the outcome and results of the selected project, including all tasks included in this project. It shall <br /> include, at least,the following: a summary of monitoring results and an explanation of any unexpected monitoring results or <br /> unexpected occurrences. This shall include, where applicable, why a BMP did not obtain or exceeded the expected removal <br /> efficiency; any problems encountered and how those problems were overcome;an explanation of any project delays; a brief <br /> DEP Agreement No.G0353,Attachment A-1,Page 7 of 14 <br /> 139 <br />