My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. 2 <br /> DATE OF ISSUANCE: 3/22/2013 EFFECTIVE DATE: 3/22/2013 <br /> OWNER: Indian River County <br /> CONTRACTOR: Guettler Construction <br /> Bid No: 2012302 <br /> Project: 6Avenue Roadway Improvements— Phase 2 (4h Street to 16"'Street) <br /> OWNER's Contract No. 2012032 ENGINEER's Contract No. 9810-B <br /> ENGINEER: Indian River Countv <br /> You are directed to proceed promptly with the following changes: <br /> Description: Adjust line item 580-1 Landscaping Complete(small plants less than 7 gal) <br /> Adjust line item 580-2 Landscaping Complete(small plants greater then 7 gal) <br /> Adjust line item 590-70 Irrigation system <br /> Purpose of Work Change Directive: <br /> The project's landscaping/irrigation was substantially redesigned. Indian River County and the Contractor <br /> have agreed upon the revised cost to perform said redesign. <br /> The following conditions shall apply: <br /> 1. Must provide Hoover or Gould pumps 1-1/2 HP. <br /> 2. Size of landscaping material must be as specified on the revised plans stamped"Construction <br /> Drawings Nov 07, 2012. <br /> 3. Price includes pumping down lake, as necessary,to install Littoral zone plantings_ <br /> 4.All equipment and facilities must be in accordance with the plans. <br /> 5. Price includes all incidental items necessary for completing the landscaping and irrigation for the <br /> project. <br /> 6. Price includes littoral zone planting and mulch as specified on plans. <br /> Attachments: 1. Email dated March 18,2013. 2. Description of Itemized Bid Schedule <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of'determining change in <br /> Contract Prices: Contract Times <br /> L1 Unit Prices Ll Contractor's Records <br /> L1 Lump Sum II Engineer's Records <br /> Ll Other: L1 Other: <br /> II By Change Order: Ll By Change Order: <br /> Estimated decrease in Contract Price: Estimated increase in Contract Times:0 days <br /> $1122,700.00 Substantial Completion: 432 days; $-(-(3 <br /> Ready for Final Completion:462 days. g_31-I <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authoriza`ion. authorization. <br /> ACCEPTED- RECOMEN D: VED: <br /> B BXGIEE:R( <br /> /�`^ By: <br /> CO C (Signature) E ature) W (Si r f <br /> • Date: 3 �1 / Date: S oz 8 Date: r -/ <br /> F.\Public Woda\ENG NEERING DMSION PROJECI'S\9814H-661b Ave Pb 2 4th St to 16th SMdmim\Work Chang-Daect;ves%20-Worn Ovn.e Duueve 97 <br /> 02.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.