Laserfiche WebLink
66th Street Roadway Improvements <br /> IRC No.9810-B <br /> CHANGE ORDER No.2 <br /> Description of <br /> Itemized Changes <br /> October 8,2013 <br /> kem No. Description of Chenue Quanft Unit Unit Price Price Increase Price Decrease <br /> 210 Flea HydrantAssem F&I EA 3 3825.00 11475.00 <br /> 21 OA Sample Points EA 7 635.50 4,448.50 <br /> 215 _ mings LS 1 10 000.00 10 000.00 <br /> 271 Pressure Test __ _ LS 1 1,200.00 $ 1,200.00 <br /> 220 TemporaryJum rAssemb F&1 EA 1 2,021.00 2,021.00 <br /> —24-0-- Sury 8 As-BuBts _ LS 1 11 000.00 11 000.00 <br /> UtIllUes-Aerie!Bridge Crossing <br /> 252 8"Flan ed and Coated DIP.F&I LF 136 155.00 $ 21 080.00 <br /> 254 8"Flanged and Coaled 22.5'3-r.,F&I FA 2 1,460.00 2,900.00 <br /> 256 8"M.J.45'B-&.Far FA 2 400.00 $ 800.00 <br /> 258 Concrete Pipe Cradles F&I EA 8 1,200.00 $ 9,600.00 <br /> 260 Aulomatic Abov"round ARV F&I EA 1 3,760.00 $ 3,750.00 <br /> Time added- 30 Days <br /> SUB-TOTAL-UTILITY DEPARTMENT ITEMS $ 186,880.50 <br /> TOTAL CHANGE ORDER NO.2 $ 132,209.80 <br /> Time Added-Rain days-20 Days <br /> Time added-ATT Delays-53 Days <br /> Total time added to contract 167 Da s <br /> O <br /> 96 <br /> F:1Pub0k WorkxT-NGiNEERiNG DMSION PROJECTSM108.88th Ave Ph 2 4N St to 16th St1AdmIm1CMANGE ORDERS1Chenge Order Form No 2 BBN 10.8-13 Page 4 <br />