Laserfiche WebLink
66th Street Roadway Improvements <br /> IRC No.9810-B <br /> CHANGE ORDER No.2 <br /> Description of <br /> Itemized Changes <br /> October 8,2013 <br /> Item No. Description of Chane Guantity Unit Unit Price Price Increase Price Decrease <br /> Time added-25 Days <br /> 101-1 Mobilization(Drainage Crew 1 LS $ 1,700.00 1,700.00 <br /> 104-1 Erosion Control SIR Fence Jule Not,Etc. 1 LS S 1,500.00 S 1,500.00 <br /> 102-1 MOT 25 PD $ 185.00 $ 4,625.00 <br /> 108-2 Survey and Control 1 LS $ 2,420.00 $ 2,420.00 <br /> 108-1 Record DravAncts 1 LS $ 2,420.00 $ 2,420.00 <br /> 110-1-1 Clearing and Grubbs Includes RR Ties 1 LS $ 5,000.00 $ 5 000.00 <br /> 120-6 Embankment 1,500 CY 4.50 $ 6.7 0.00 <br /> NEW 15 Remove and Replace Fence(By othersLF $ 12.00 <br /> NEW 16 Install 12'Wide Double Swing Gate(By othersEA $ 3.750.00 <br /> NEW 17 Sod Pins 5,850 E4 $ 0.10 $ 585.00 <br /> NEW 18 Saw Cut Existing Pipe 1 LS 550.00 $ 550.00 <br /> NEW 19 Install Concrete Collar 1 LS $ 650.00 $ 650.00 <br /> 430-175-101C 15'RCP 44 LF $ 20.00 $ 880.00 <br /> 425-1-903 Install Type J-5 1 EA 3,589.00 3,589.00 <br /> Sub-Total $ 30,669.00 <br /> SUB-TOTAL(increase I Decrease) $ 232,940.50 ; 237,611.20 <br /> SUB-TOTAL WORK DIRECTIVES $ (4,670.70 <br /> Utilities Department Items <br /> 101-1 Mobilization LS 1 $ 2,5D0.00 $ 2,500.00 <br /> 102-1 MOT DAY 30 $ 175.00A 5,25000 <br /> 0706-3 While RPM F&1 EA 8 $ 4.00 $ 32.00 <br /> 0706-3-1 Blue RPM F&I EA 3 $ 5.00 3 1500, <br /> 0705-10-5 Permanent Land Marker K-9 F&I EA 4 60.00 240.00 <br /> UW MC-1 B 8'DR-18 C-900 PVC F&1 LF 2 953 $ 25.00 73 825.00 <br /> UWMGIC 8'DIP Class 350 F&I LF 117 52.00 $ 6,08400 <br /> UWMG1 D 12-DR-18 C9D0 PVC F&I LF 20 33.00 S 660.00 <br /> OF-2 U Fbdure 8'M.J.Gate Valve E4 8 2 100.00 $ 16 800.00 <br /> 190 18"x 2'Blow-0K Assembly,F&I EA 2 1,6W.00 3,200,C <br /> F.1Pubk Wofts ENOINEEFUNG DMSION PROJECTS198105-96th Ave Ph 2 4th St to 16th ShAdMm1CHANOE ORDERS%Dwngs Order Fonn No 2 86th 10.9.13 Page 3 95 <br />