Laserfiche WebLink
66th Street Roadway Improvements <br /> IRC No.9610-B <br /> CHANGE ORDER No.2 <br /> Description of <br /> Itemized Changes <br /> October 8,2013 <br /> Item No. Description of Chane Quantity Unit Unit Price Price Increase Price Decreaso <br /> NEW 6 Oen Road Cut 1 LS S 2 ODD.00 $ 2,000.00 <br /> NEW 7 SIIIFence 1D0 LF $ 1.00 $ 100.00 <br /> 425-1-521 Type C Inlets 3 EA $ 1.342.00 $ 4.026.00 <br /> NEW 6 12x1B ERCP 28 LF $ 40.00 1,120.00 <br /> NEW 9 13x17 CAP 10 LF 55.00 $ 550.00 <br /> 430-175.1018 12'CAP 74 LF 35.00 2,590.00 <br /> NEW 10 Driveway Remove and Replace 2 EA $ 1 300.00 $ 2,600.00 <br /> NEW 11 Hold FPL Pole 1 EA $ 2.500.00 $ 2,500,00 <br /> Sub-Total $ 17,956.00 <br /> WORK DIRECTIVE NO.5 Miscefianeous Drainage Modifications <br /> NEW 12 Remove 18'RCP 89 LF $ 18.00 1.602.00 <br /> NEW 13 Re4a 18'Pipe 89 LF $ 20.00 1,780.00 <br /> NEW 14 F&I Flap Gate 1 LS 918.00 $ 918.00 <br /> Sub-Total $ 4,300.00 <br /> Modify,the existing driveway for William&Eva Graves to provide <br /> WORK DIRECTIVE NO.6 safe Ingress and egress around retention pond 100. <br /> Time added-4 Days <br /> 102-1 MOT 4 PD $ 162.00 648.00 <br /> 120.6 Embankment 1,266 CY $ 4.50 $ 5,697.00 <br /> 160AA 12'Stabilized Su rade 1,375 SY 2.00 3 2.750.00 <br /> 286-1-1 Turnout Construction Pavement 78 SY $ 17.50 $ 1365.00 <br /> 350-2.1 6"Concrete Reinforced 34 SY $ 25.00 850.00 <br /> 522-2 6'Concrete Sidewalk 13.3 SYF17 <br /> $ 319.20 <br /> 550.60-926 24'SwIn Gates 1 EA 1,780.00 <br /> 570-1-2 Seed and Mulch 3000 SY 1 500.00 <br /> 108-1 Surve and As-builts 1 LS . 2,167.00 <br /> Sub-Total $ 16 757.00 $ 319.20 <br /> $ 16,437.80 <br /> Construct 24 foot wide dirt driveway that ties In with the Atlantic <br /> WORK DIRECTIVE NO.7 Boulevard re-alignment for Nicole Grice I West horse pasture. <br /> 94 <br /> F.'Pubk WorkstENGINEERING DIVISION PROJECTM81 Da-66th Ave Ph 2 41h Sr to 18th SMdmimICHANGE ORDERMhangs Order Ferro No 2 86th 10-8-13 Ppe 2 <br />