My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. 3 <br /> DATE OF ISSUANCE: 4/24/2013 EFFECTIVE DATE: 4/24/2013 <br /> OWNER: Indian River County <br /> CONTRACTOR: Guettler Construction <br /> Bid No.- 2012302 <br /> Project: 66th Avenue Roadway Improvements — Phase 2 (4'h Street to 16'h Street) <br /> OWNER's Contract No. 2012032 ENGINEER's Contract No. 9810-B <br /> ENGINEER: Indian River County <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Modify and relocate the 0'Street underdrain system (Sta. 20+25.20 to Sta. 27+80) per revised <br /> Construction Plan Sheets 10, 12, 14A, 23, 57, 58, 111, 112 and 151 dated 3/7/13. <br /> Purpose of Work Change Directive: <br /> The 4'h Street underdrain system east of 66'h Avenue was moved from the south side of the proposed 72" <br /> RCP to the north side to reduce the construction area limits of clearing and to protect existing trees. <br /> Attachments: <br /> 66'h Ave Trench Drain Changes price quote dated 4/17/2013. <br /> 4' <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> II Unit Prices B Contractor's Records <br /> n Lump Sum ❑ Engineer's Records <br /> II Other: ❑Other: <br /> II By Change Order II By Change Order: <br /> Estimated increase in Contract Price: Estimated increase in Contract Times: 30 days <br /> $48,636.86 Substantial Completion:462 days; <br /> �I � Ready for Final Completion: 492 days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: P OV <br /> By; By- <br /> T _71 <br /> y- <br /> C RA TO ature) ENGINEER(Signature) OWNS ign re) <br /> Date.- ql2q o Date: 4 `f 3 Date: <br /> FAPubbe WorksNENGTNEEKING DJYLSION PROJECfSl9810B-66th Ave Ph 2 4th St to 16th SAAdm.mlWork Chance Duc=vcsX9920-Wort;Change Dutcbve <br /> 91doc 99 <br />