My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/17f2D13 4:05 3OPM <br /> 66th Ave Trench Drain Changes <br /> Guettler Brothers Construction LLC. <br /> 4401"'hiteway Dairy Rd. <br /> Fort Picrce FL 34949 <br /> Contact: Bcn Guctticr <br /> Phone: 772-461-8345 <br /> Fax: 772-461-8039 <br /> Quote To: Indian River County Job Name: 66th Trench Drain Changes <br /> 1801 27th Street,Bldg.A Engineer: <br /> Vero Beach FL 32960 Date of Plans: <br /> Phone: <br /> jtevision Date: <br /> Fax: <br /> Location: <br /> E-Mail: dkeitb@ircgov.com <br /> Ann: Don Keith <br /> Prices good for 30 Days From Bid <br /> ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br /> 50 Clearing and Grubbing -1.00 LS 2,500.00 -2,500.00 <br /> 55 12"Trench Drain -787.00 LF 43.00 -33,841.00 <br /> 57 18"RCP -24.00 LF 23.00 -552.00 <br /> 59 24"RCP -3.00 LF 33.00 -99.00 <br /> 100 MOT 5.00 DAY 250.00 1,250.00 <br /> 1121 Flaggers(For Local Traffic) 15.00 DAY 600.00 9,000.00 <br /> ti 5 1 Import A-3(Elev 18-13.5=4.5 Deep)x 3wide= 347.00 CY 4.50 1,561.50 <br /> 120 15"Slotted RCP Trench Drain 695.00 LF 88.00 61,160.00 <br /> 125 15"RCP 63.00 LF 20.00 1,260.00 <br /> 130 Manhole P-7 4.00 EA 2,083.00 8,332.00 <br /> 140 Saw Cut for 15"RCP 3.00 EA 855.00 2,565.00 <br /> 145 Plug Hole for 12"Underdrain 1.00 EA 500.00 500.00 <br /> GRAND TOTAL <br /> S48,636.50 <br /> NOTES: <br /> No allowance to replace existing roadway or millings. <br /> Price includes the use of Recycled Concrete Aggregate for 57 stoke. <br /> Price is based on 30 day time extension, <br /> See attached shop drawings. <br /> Page 1 of 1 <br /> 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.