My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRCU staff Harold Seeley Chief Operator, Mike Vernon Chief Operator, Richard Meckes Wastewater <br /> Superintendent, and I held a meeting with the TWA representative on Wednesday September 18, 2013. <br /> During the meeting we explained that on several occasions our present Instrument Control Company <br /> had been called because an item within the plant system software/SCADA would not allow us to start <br /> the water plant. <br /> We discussed with the TAW representative that in the event the facility was unable to produce water in <br /> a timely manner the circumstance would be critical. In this discussion we found that TAW does not have <br /> any ongoing contracts for monthly maintenance or after hour emergency calls for software/SCADA <br /> issues. TAW indicated that they have two(2)software/SCADA employees that could perform the <br /> monthly maintenance and emergency callouts, but could not guarantee that the technician on call <br /> would be familiar with our facilities. Additionally, it might not be the same person that would be <br /> working at each facility for the monthly maintenance. <br /> In the last two years the present IRCU Instrument Control Company has responded to one(1)after <br /> hours site visit to resolve a SCADA system issues. <br /> o Total time-7 hours. <br /> In the last two years they responded to five(5)after hours services calls. They were able to resolve the <br /> issues by dialing into our SCADA system over the phone line. <br /> o Total time-13 hours. <br /> Recommendation: <br /> IRCU acknowledges that TAW is very capable and experienced with installing/start up of <br /> software/SCADA equipment, but has no experience with emergency callouts for troubleshooting PLC <br /> software/SCADA systems as the bid requests. With the critical nature of our after hour calls to <br /> troubleshoot a problem we do not feel that TAW is capable at this time to perform the duties as <br /> outlined in the bid. <br /> Staff recommends the second lowest bidder, SCADA Solutions of Port St. Lucie, be awarded the <br /> #2014005 Annual Bid. The SCADA Solutions technicians are familiar with all IRCU Water facilities and <br /> staff feels they are the best bidder to perform all duties outlined in the bid packages. <br /> Funding <br /> Funds for the Instrument Control Tech will be covered under Account No.47121936-033190,Other <br /> Professional Services. Funds Budgeted for FY 13-14 are$30,000.00. Cost for the past years are: FY 11- <br /> 12=$25,500; FY 12-13=$25,000 <br /> CADocuments and Settings\a0crtautschU-ocal Settings\Temporary Internet Filcs\Content.Outlook\XOW7294FlMemo to Jennifer Hyde Bid <br /> #2014005 Instrument Water Plant Sept 23 2013 Q(2).doc 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.