Laserfiche WebLink
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> ATTACHMENT D <br /> RISK ASSESSMENT PLAN (SAMPLE ONLY) <br /> This template should be used. The Risk Assessment (RA) Plan should address the risks that the <br /> Contractor does not control. The risks should be prioritized(list the greatest risks first). The Contractor <br /> may add or delete Risk table templates, but do not exceed the 2-pane limit for this section. Do not <br /> include any identifying information in the RA Plan. Information listed under the "Documented <br /> Performance" line may describe where the Contractor has used the approach or solution previously, and <br /> what the results were in terms of verifiable metrics. <br /> Example: <br /> Risk that is not identified by County professional, competing contractors, or <br /> expert Contractor will be identgied and solved within 3 days nraxinnon (unless <br /> Risk Description: more time is justified and requested <br /> Risk Impact/Why is Unforeseen circumstances I risks rncny cause a deviation to our planned <br /> this a risk: baseline expectation. <br /> Once we are notified of a change, we will take the following action: <br /> I. Contractor shall immediately notify the designer and County the <br /> same day as discovery of'potential cost and time impact <br /> Z Contractor shallf fnd best possible options to minimize risk, with <br /> accompanying cost and time <br /> Contractor shall propose the best solution with justification and present to <br /> Solution: County representative <br /> We use this approach as part of'every project we complete. We have had to <br /> use the approach 15 times over the past 3 years. Our solution resulted in less <br /> Documented than I%change orders, and 100%of the CLIENTS on these 15 projects rated <br /> Performance: our performance 10 out of'10 <br /> Risk#1 Description: <br /> Risk Impact/Why is <br /> this a risk: <br /> Solution: <br /> Documented <br /> Performance: <br /> Risk#2 Description: <br /> Risk Impact/Why is <br /> this a risk: <br /> Solution: <br /> Documented <br /> Performance: <br /> 4 <br /> 1 <br /> 32 <br /> i <br /> I <br /> 1 7 Z 3ti <br />