Laserfiche WebLink
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> VALUE ADDED PLAN (SAMPLE ONLY) <br /> This template should be used. The Value Added (VA)Plan should identify any value added options or <br /> ideas that may benefit the County. The value added claims should be prioritized (identify the most <br /> important claims first). The Contractor may add or delete Value Added Claim table templates, but do not <br /> exceed the 2-pate limit for this section. Do not include any identifying information in the VA Plan. <br /> Information listed under the "Documented Performance" line may describe where the Contractor has <br /> used the approach or solution previously, and what the results were in terms of verifiable metrics. Only <br /> use percentages of base costs for each claim. Do not include any dollar amounts. Contractor should note <br /> whether the claim is an additive or deductive change. <br /> Example: <br /> Reroofing this building will not stop all water leaks. The majority of the <br /> leaks are caused by cracks in the parapet wall..s, broken/missing glass, <br /> Item Claim: and poor caulking <br /> How will this add value? <br /> This approach in 8 similar projects has worked 100%of the time in <br /> Documented Performance: stopping all leaks <br /> Cost Impact(%): 0.75% Schedule Impact —0-25% <br /> Item#1 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact(%): <br /> Item#2 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact (%): <br /> Item#3 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact(%): <br /> Item#4 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact(%): <br /> Item#5 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact(%): <br /> 33 <br /> ? 2. 3 3 <br />